H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
Product Specifications
| Attribute |
Value |
| Steel Grade |
Q235B Q345b Low Carbon Steel |
| Main Structure |
Hot Rolled or Welded H Section, I Section |
| Connect |
All Bolt Connection (High-Strength and Normal Bolt) |
| Roof/wall material |
Single Sheet or Sandwich Panel |
| Usage |
Steel Structure Platform, Steel Workshop, Structural Roofing, Steel Walkway and Floor, Steel Fabricated House, Frame Part, Steel Structure Bridge |
| Door |
Walk Door, Sliding Door, Roller Door |
Product Features
- Custom Design: Free architectural drawings provided
- Fast Assembly: Flexible, safe installation with thermal and noise insulation
- Cost-Effective: Quick installation reduces construction time and costs
- Durability: Low-maintenance structure with 50+ year lifespan
- Weatherproof Design: Leak-proof construction with national fire prevention standards
- Structural Strength: Resists strong winds, seismic activity, and heavy snow loads
Construction Details
| Base |
Cement and steel foundation bolt |
| Main frame |
H beam |
| Material |
Q235B, Q345B or custom specifications |
| Purlin |
C or Z purlin: Size from C120~C320, Z100~Z20 |
| Bracing |
X-type or other type bracing made from angle, round pipe |
| Bolt |
Plain bolt and High-strength bolt |
| Roof & wall |
Sandwich panel or color plate |
| Door |
Sliding or rolling door |
| Window |
Aluminium alloy window |
| Surface |
Two times of Anti-rust Painting or Hot Dip Galvanized |
| Sheet |
0.5mm or 0.6mm galvanized sheet |
| Accessories |
Semi-transparent skylight belts, Ventilators, down pipe, galvanized gutter, etc |
Installation Process
After foundation preparation, anchor bolts must be precisely positioned according to provided axis and elevation specifications. All anchor bolts must be perfectly aligned to ensure steel columns are placed in straight lines.
Steel Column Installation: Foundation nuts must be leveled before hoisting. No personnel should stand within crane lifting range during operation. After positioning, anchor nuts should be properly tightened.
Steel Beam Assembly: After completing steel column tie rods/column supports, steel beams are lifted into position. All connections must achieve proper bolt tightening with consistent direction.
Welding Specifications: Roof steel beams use high-strength bolts (no welding required). Platform beams include main beams (generally welded with wing plates) and secondary beams (typically not welded).