Steel Profile C Stud / Drywall Channel Making Roll Forming Machine with PLC Control
Professional roll forming machine for manufacturing steel profile C studs and drywall channels with advanced PLC control system for precision and efficiency.
Machine Components
| No. |
Name |
Unit |
Qty |
| 1 |
1.5T Manual Decoiler |
set |
1 |
| 2 |
Main Forming Machine |
set |
1 |
| 3 |
PLC Control System |
set |
1 |
| 4 |
Hydraulic Pump Station |
set |
1 |
| 5 |
Post Cut |
set |
1 |
| 6 |
Electric Motor |
set |
1 |
| 7 |
Output Table |
set |
1 |
Machine Specifications
Decoiler:
- Max. Width: 500mm
- Inner Diameter: Φ450 - Φ550 mm
- Out Diameter: 1500 mm
- Max. Loading Capacity: 3000 kgs
Roll Forming Machine:
- Material Thickness: 0.5-1.0mm PPGI and GI
- Number of Roller Stations: 8 groups
- Material for Rollers: Cr12 steel polished and coated with chrome HRC58-62°
- Material for Shaft: High grade 45# steel polished and coated with chrome HRC58-62°
- Diameter of Shaft: 60mm
- Frame Panel: Casting type
- Bottom Frame: 36# H-section steel
- Motor Power: 3kw
- Driven Type: Chain
- Speed: 8-12m/min
Cut-Off Device:
- Material for Cut-Off Modular: Cr12 steel after treatment
- Hardness for Heat Treatment: HRC58 - 62°
- Cut-Off Type: Mould Cutting
- Motor for Hydraulic Stand: 3kw
PLC Control Box:
- Type: PLC Frequency Control System with touch screen
- PLC Brand: Delta
- Encoder Brand: Omron
- Length Error: ±2mm
- Language: English and Chinese
- Voltage: 380v/50HZ, 3Phase (customizable to customer requirements)
Hydraulic Pump Station:
- Oil Type: 46# hydraulic oil
- Pump Brand: China brand
Warranty & Support
- If buyers visit our factory, we provide installation training and worker/technician training face-to-face
- Without visiting, we provide user manual and instructional videos for installation and operation
- On-site technician service available with arrangement of round trip tickets, accommodation, and daily salary of USD100
Frequently Asked Questions
How to visit our company:
- Fly to Beijing Airport: Take fast train from Beijing South station to Cangzhou west station (1 hour), then we provide pickup to factory (40 minutes)
- Fly to Shanghai Airport: Take fast train from Shanghai Hongqiao station to Cangzhou west station (4.5 hours), then we provide pickup to factory (40 minutes)
Custom machine requirements:
- Provide profile drawing, material specifications, thickness, voltage requirements, and any special requirements
Warranty details:
- 24-month warranty period with technical support available at any time
- If parts cannot be repaired, we provide replacement parts free during warranty (customer pays express costs after warranty)
- Lifetime technical support for equipment
On-site technician service:
- We send technicians to your country for machine debugging and training
- Customer covers visa costs, round trip tickets, accommodation, and daily salary of USD100
Product Images