Fire Damper Roll Forming Machine
Technical Parameter
| Material of coil | Material Thickness | 1.0--1.5mm |
| Un Coiler | 5 tons manual | |
| Forming system | Rolling Speed | About 10m/min |
| Roller Stations | About 16 stations | |
| Roller Material | Gcr15 coated with chrome
| |
| Shaft diameter | 65mm | |
| Maim Motor Power | 11kw | |
| Pinching motor | 2.2kw | |
| Motor cutting Power | 7.5kw | |
| Cutting system | Material Of Cutting | CR12mov with quench treatment |
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Cutting blades | 3 sets | |
| Electrical control system | Electric Source | 380V, 50HZ,3 phase Also can satisfy Customer’s requirey |
| Control System | PLC (Panasonic) as list in the note | |
| Weight | About 8 tons | |
| Way Of Drive | 1.2 inch chain |
Fire Damper Main Components
Working Flow of Fire Damper
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table

Profile of product


Loading picture

After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)