0.3-0.5mm Light Keel Ceiling T Bar Suspended Ceiling Grid Roll Forming Machine
T Grid Roll Forming Machine Technical Parameter
| Items | Specifications | |
| Material of coil | Material Thickness | 0.3-0.5 mm galvanized PPGI | 
| De-coiler | Weight | 3 tons manual | 
| Knurls | Two sides | 1 sets of roll | 
| Forming system | Rolling Speed | 10-15 m/min | 
| Roller Stations | About 16 stations forming | |
| Roller Material | Gcr15 Steel with quenching | |
| Shaft Material |  			 45# Steel Diameter 75mm shaft 
  |  		|
| Maim Motor Power | 7.5 kw | |
| Hydraulic cutting Power | 4 kw | |
|  			 Cutting system  |  			Material Of Cutting | CR12 with quench treatment | 
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Cutting blade | 1 set of cutting blade | |
| Electrical control system | Electric Source |  			 380V, 50HZ,3 phase 
  |  		
| Control System | PLC with touch screen Japanese Panasonic and Yaskawa Brand | |
| Joint system | stations | About 5 stations | 
| Weight | TON | About 3 tons | 
| Way Of Drive | Gear box | |
| Size of machine | mm | Length 7500mm* Width 800mm* Height 800m | 
Machine’s Components
|  			 3 tons manual uncoiler  |  			 			 1set  |  		
|  			 Hydraulic punching device  |  			 			 1set  |  		
|  			 Main roll forming systerm  |  			 			 1set  |  		
|  			 Hydraulic cutting  |  			 			 1set  |  		
|  			 Hydraulic station  |  			 			 1set  |  		
|  			 PLC control table  |  			 			 1set  |  		
|  			 Locking device for joints  |  			 			 1set  |  		
|  			 Final product runout table  |  			 			 1set 
  |  		
Working Flow of Roll Forming Machine
Decoiler—feedingwithguide—Rollforming——hydraulicPunching——Cutting—Products collecting
Standard Profile drawing of product
 


Payment terms and after-sale service
1) FOB Shanghai
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual to teach you to install and operate.
Exhibition New:
You are warmly invitated to visit our booth at 2017 Thailand International Building Materials Exhibition at Bangkok May 2nd-7th, our booth No is N603-3; Mosbulid, time is from 4th, April to 7th, April, and our booth number is U1, Hall 7.4
Exhibition name:2018 China (Guangzhou) international integrated housing Expo
 Date:15-17th,May
 Place:Guangzhou Pauli exhibition hall
 Number:H915 and H916