Specifications
Place of Origin :
china
Maintenance requirement :
Low To Moderate
Fire resistance :
Fireproof Coatings Available
Installation time :
4 To 12 Weeks Depending On Size
Name :
Steel Frame Bridge
Supply Ability :
20000 tons per month
Price :
USD 25-100 per square meter/Negotiable
Payment Terms :
T/T, L/C, Western Union, MoneyGram
Material :
High-strength Steel
Environmental impact :
Recyclable Materials Used
Certification :
CE,ISO9001
Durability :
50+ Years With Maintenance
Corrosion protection :
Hot-dip Galvanization
Delivery Time :
25-55 days
Packaging Details :
Steel pallet
Customizationoptions :
Available For Dimensions And Load Specifications
MOQ :
100 square meters
Description
Product Overview

This fireproof steel frame bridge is a durable steel bridge construction built from high-strength steel with hot-dip galvanization for corrosion protection. Featuring recyclable materials and a durability of 50+ years with maintenance, it offers customization options for dimensions and load specifications, with installation typically completed in 4 to 12 weeks depending on size.

Specifications
AttributeValue
CustomizationoptionsAvailable For Dimensions And Load Specifications
Fire resistanceFireproof Coatings Available
Installation time4 To 12 Weeks Depending On Size
Environmental impactRecyclable Materials Used
Maintenance requirementLow To Moderate
Corrosion protectionHot-dip Galvanization
MaterialHigh-strength Steel
NameSteel Frame Bridge
Durability50+ Years With Maintenance
Application Scenarios
  • Pedestrian and vehicle bridges
  • Industrial access bridges
  • Municipal infrastructure
  • Custom steel frame bridges
Key Advantages
  • Fireproof coatings available
  • Hot-dip galvanization for corrosion protection
  • 50+ years durability with maintenance
  • Recyclable materials used
  • Customizable dimensions and load specifications
FAQ

Q1: How long does the bridge last?
A: 50+ years with maintenance.

Q2: What corrosion protection is applied?
A: Hot-dip galvanization.

Q3: How long does installation take?
A: 4 to 12 weeks depending on size.

Send your message to this supplier
Send Now

Fireproof Steel Frame Bridge Durable Steel Bridge Construction Recyclable

Ask Latest Price
Watch Video
Place of Origin :
china
Maintenance requirement :
Low To Moderate
Fire resistance :
Fireproof Coatings Available
Installation time :
4 To 12 Weeks Depending On Size
Name :
Steel Frame Bridge
Supply Ability :
20000 tons per month
Contact Supplier
video
Fireproof Steel Frame Bridge Durable Steel Bridge Construction Recyclable
Fireproof Steel Frame Bridge Durable Steel Bridge Construction Recyclable

Changzhou Feiang Technology Co., Ltd

Verified Supplier
1 Years
zhejiang, hangzhou
Since 2014
Business Type :
Manufacturer
Total Annual :
250000000-300000000
Employee Number :
1200~1500
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement