Product Overview
A flexible steel prefabricated building designed for large-scale industrial, commercial, and residential applications. This pre-fab metal building features a high-quality steel frame with insulated sandwich panels, enabling rapid assembly of large factory buildings and workshops within days. The flexible design adapts to client requirements, making it a versatile solution for large-scale projects ranging from industrial plants to commercial complexes.
Specifications
| Name | Steel Prefabricated Building |
| Foundationtype | Concrete Slab Or Pile Foundation |
| Roofmaterial | Steel Panels With Insulation |
| Material | High-quality Steel |
| Assemblytime | Rapid Assembly, Typically Within Days |
| Wallmaterial | Insulated Sandwich Panels Or Metal Sheets |
| Customization | Flexible Design According To Client Requirements |
| Fireresistance | Fire-retardant Materials And Design |
| Dimensions | Customizable Length, Width, And Height |
| Payment Terms | T/T, L/C, Western Union, MoneyGram |
| Price | USD 25-100 per square meter/Negotiable |
| Minimum Order Quantity | 100 square meters |
| Packaging Details | Steel pallet |
| Delivery Time | 25-55 days |
| Supply Ability | 20000 tons per month |
| Certification | CE,ISO9001 |
| Place of Origin | china |
Application Scenarios
Large industrial plants · Commercial complexes · Factory buildings · Workshops · Large residential projects
Key Advantages
FAQ
Q: What is the maximum span for this large-scale steel building?
A: The building can be designed with large-span steel frames to create column-free interior spaces. Please contact our engineers with your required span, and we will provide a customized structural design.
Q: Can the dimensions be customized for my factory project?
A: Yes, the length, width, and height are fully customizable. Our engineering team will design the building according to your site conditions and production requirements.
Q: How long does assembly take for a large factory building?
A: Thanks to the prefabricated modular system, assembly typically takes days to weeks depending on the building size, significantly faster than traditional construction.