Product Overview
This large-scale steel prefabricated building is engineered as a spacious industrial steel structure factory hall, combining fire-retardant materials with a robust modular steel frame. Designed for heavy-duty production environments, it delivers exceptional fire resistance, thermal and sound insulation, and the structural strength to withstand local wind and snow loads. Every dimension is fully customizable, making it an ideal turnkey solution for large factory buildings, production workshops, and industrial facilities.
Specifications
| Name | Steel Prefabricated Building |
| Insulation | Thermal And Sound Insulation Options Available |
| Fireresistance | Fire-retardant Materials And Design |
| Loadcapacity | Designed To Withstand Local Wind And Snow Loads |
| Framematerial | Cold-formed Steel Or Hot-rolled Steel |
| Dimensions | Customizable Length, Width, And Height |
| Productname | Steel Prefabricated Building |
| Foundationtype | Concrete Slab Or Pile Foundation |
| Material | High-quality Steel |
| Delivery Time | 25-55 days |
| Minimum Order Quantity | 100 square meters |
| Supply Ability | 20000 tons per month |
| Payment Terms | T/T, L/C, Western Union, MoneyGram |
| Price | USD 25-100 per square meter/Negotiable |
| Packaging Details | Steel pallet |
| Place of Origin | china |
| Certification | CE,ISO9001 |
Application Scenarios
Large industrial factory buildings · Production workshops · Assembly plants · Heavy equipment halls · Multi-purpose industrial facilities
Key Advantages
FAQ
Q: What is the maximum span for this large-scale steel building?
A: The building can be designed with large-span steel frames to create column-free interior spaces. Please contact our engineers with your required span, and we will provide a customized structural design.
Q: Can the dimensions be customized for my factory project?
A: Yes, the length, width, and height are fully customizable. Our engineering team will design the building according to your site conditions and production requirements.
Q: How long does assembly take for a large factory building?
A: Thanks to the prefabricated modular system, assembly typically takes days to weeks depending on the building size, significantly faster than traditional construction.