Dx51d Hot Dipped Galvanized Steel Coil z100 z275 Price Dx52d Cold Rolled Galvalume Gi Coil
Product | Galvanized Steel Coil | Certificate | ISO9001 | Grade | DX51D Dx52D Dx53D Dx54D Dx55D | Surface Treatment | coated, chromated, oiled | Thickness | 0.12-4.0mm | Width | 600-1250mm | Zinc coating | 30-275g/m2 | Spangle | zero/small/regular/big | Capacity | about 10000 tons per month for the coil product | Package | plastic film + water proof paper + steel plate+ packing steel strip. | Application | construction, home appliance, ship building, etc. | | | Chemical passivating treatment | minimize the chance of white rust forming during the transit and storage | maintain the bright shiny appearance for a longer time | Oils | minimize the tendency for storage and transit stain | passivating + oils | provide the protection from the storage and transit stain by special chemicals called corrosion inhibitors | |
Standard | Jis 3302 | EN10327/EN10326 | ASTMA653 |
| SGCC/SGCH | DX51D+Z/DX52D+Z | CS |
SGC340 | S22DGD+Z | SS GRADE 230 |
SGC400 | S25DGD+Z | SS GRADE 255 |
SGC440 | S28DGD+Z | SS GRADE 275 |
SGC490 | S32DGD+Z | SS GRADE 340 |
SGC570 | S35DGD+Z | SS GRADE 550 |
| SS55DGD+Z | |

FAQ:
Q:Can you send samples?
A:Of course, we can send samples to all parts of the world.
Q:What are the shipping ports?
A:Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao ports, you can choose other ports according to your needs.
Q:What are the certifications for your products?
A:We have ISO 9001, SGS, EWC and other certifications.
Q:How long does your delivery time take?
A:In general, our delivery time is within 7-15 days, and may be delayed if the demand is extremely large or special circumstances occur.
Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q:Does the product have quality inspection before loading?
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed.
Q:How to pack the products?
A:The inner layer has a waterproof paper outer layer with iron packaging and is fixed with a fumigation wooden pallet. It caneffectively protect products from corrosion during ocean transportation.Send your message to this supplier