Specifications
Brand Name :
Shunyao Supply Chain
Place of Origin :
Chengdu , China
MOQ :
100 PCS
Price :
$20-40
Payment Terms :
T/T
Supply Ability :
Excellent
Delivery Time :
5-15 days
Packaging Details :
Bundles
Walltype :
Steel panels
Features :
Steel Structure For Auto Service Shop
Structure Type :
Steel Frame Building
Installationtime :
2 to 6 weeks
Surface Treatment :
painted with international paint
Windresistance :
Wind load compliant up to 200 km/h
Life Span :
Around 30~50 Year
Size :
Customized
Maintenance :
Low maintenance required
Span :
Customizable, typically 10-30 meters
Package :
Steel pallet
Product Features :
Hurricane Proof
Maintenance Costs :
Reduced
Surfacetreatment :
Galvanized or painted
Production :
Finished for direct install support
Description
Easily Assembled Thickness Powder Coated Steel Scaffolds
Our thickened steel frame scaffolding with powder-coated finish is engineered for daily construction applications. Constructed from solid steel material, it delivers exceptional stability and load-bearing capacity, while the powder coating provides superior protection against rust and wear, making it ideal for both long-term outdoor and indoor use.
Key Features
  • Simple modular structure for easy assembly, disassembly, and transport
  • Quick setup without complicated tools, improving work efficiency
  • Reduces labor costs and increases productivity on job sites
  • Suitable for building construction, exterior wall painting, equipment maintenance, and decoration projects
  • Manufactured under strict quality control for safety and reliability
Product Specifications
Material Steel, Galvanized Steel, Q345 Steel, Q195 Steel, Q235 Steel
Performance Level High Strength, Corrosion-resistant
Warranty 3 Years
After-sale Service Online Technical Support
Design Style Modern
Brand Name CDRFKY
Model Number Frame Scaffolding
Color Silver/Customized Color
Pipe OD 42mm
Packing Bundle
Product Gallery
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Technical Parameters
Out Diameter (Inch) Wall Thickness (mm) Length (m)
1/2"0.5-2.756.0M/5.8M, 1-12m (customized)
3/4"0.5-2.756.0M/5.8M, 1-12m (customized)
1"0.5-3.756.0M/5.8M, 1-12m (customized)
1-1/4"0.5-5.06.0M/5.8M, 1-12m (customized)
1-1/2"0.5-5.0+6.0M/5.8M, 1-12m (customized)
2"0.5-5.0+6.0M/5.8M, 1-12m (customized)
2-1/2"0.8-5.0+6.0M/5.8M, 1-12m (customized)
3"0.8-5.0+6.0M/5.8M, 1-12m (customized)
4"0.8-4.06.0M/5.8M, 1-12m (customized)
5"1.1-4.756.0M/5.8M, 1-12m (customized)
6"1.1-6.0+6.0M/5.8M, 1-12m (customized)
8"1.2-6.5+6.0M/5.8M, 1-12m (customized)
10"2.75-5.0+6.0M/5.8M, 1-12m (customized)
Additional Product Details
Product NameFrame Scaffolding Tube (Anti-erosion Coating)
Size/Diameter1/2"-12" (21.3-323.9mm)
Wall Thickness0.8-10.0mm
Length6.0M, 6.5M, 5.0M, 4.0M, 3.0M, 1m-12m (customizable)
International StandardsISO 9000-2001, CE CERTIFICATE, BV CERTIFICATE
MaterialsS235GT, S355, STK400, STK500, Q345/Q235
TechniqueWelded
Country of OriginChina
Productivity5000 Metric Tons per Day
Ordering Information:
Payment Terms: T/T, L/C
Trade Terms: FOB, CFR, CIF, DDP, EXW
Minimum Order: 2 tons
Lead Time: On or before 20 days
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Send your message to this supplier
Send Now

Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance

Ask Latest Price
Watch Video
Brand Name :
Shunyao Supply Chain
Place of Origin :
Chengdu , China
MOQ :
100 PCS
Price :
$20-40
Payment Terms :
T/T
Supply Ability :
Excellent
Contact Supplier
video
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance
Powder Coated Steel Frame Scaffolding with Easy Assembly and Wind Load Compliance

Sichuan Shunyao Supply Chain Management Co., Ltd.

Verified Supplier
1 Years
chengdu
Since 2018
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
1000000-1500000
Employee Number :
70~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement