Specifications
MOQ :
100 PCS
Payment Terms :
T/T in advance
Place of Origin :
Chengdu , China
Brand Name :
Shunyao Supply Chain
Packaging Details :
Bundles
Delivery Time :
5-15 days
Supply Ability :
Excellent
Formwork type :
Tunnel
Installation time :
Reduced installation time compared to traditional formwork
Assembly method :
Modular and easy to assemble/disassemble
Product name :
Concrete Tunnel Formwork
Reusability :
Reusable multiple times
Weight :
Varies depending on size and material
Load capacity :
High load-bearing capacity
Description

The full name of this product is Tunnel Steel Formwork, with common other names including Tunnel Lining Steel Formwork, Tunnel Concrete Steel Mould, Trolley-Matched Steel Formwork, and Assembled Tunnel Steel Formwork. The core keywords cover Tunnel Steel Mould, Lining Steel Formwork, Custom Steel Formwork, Tunnel Construction Steel Formwork, and High-Strength Tunnel Formwork. Widely applicable to scenarios such as overseas project bidding, cross-border e-commerce display, international exhibition promotion, and technical cooperation negotiations, it is a core forming equipment for various tunnel constructions.

Compared with similar products, this tunnel steel formwork has five core advantages: first, cost controllable, reusable for 50-120 times, the turnover efficiency is 8-10 times that of wooden formwork, significantly reducing long-term use costs; second, environmental protection and energy saving, the full steel material can be 100% recycled, no wood waste, complying with global green building standards; third, high construction efficiency, modular assembly and disassembly combined with trolley use, the single-cycle pouring time is shortened to 8-12 hours, far lower than the 16-24 hours of traditional formwork; fourth, stable quality, completely avoiding problems such as easy deformation and slurry leakage of wooden formwork, and the lining qualification rate is increased to over 99%; fifth, convenient after-sales, damaged parts can be replaced individually without overall scrapping, greatly reducing maintenance costs.

Material Steel Brand Name Shunyao supply chain steel frame
Feature High Strength, Easily
Assembled, Reusable
Warranty 2 Years
Design Style Traditional After-sale Service Online Technical Support,
Onsite Installation
Project Solution
Capability
3D model design, graphic
design
Place of Origin Chengdu, China
Function Construction Concrete
Support
Surface treatment Printed

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Send your message to this supplier
Send Now

Steel Concrete Tunnel Formwork Reusable Easily Assembled

Ask Latest Price
MOQ :
100 PCS
Payment Terms :
T/T in advance
Place of Origin :
Chengdu , China
Brand Name :
Shunyao Supply Chain
Packaging Details :
Bundles
Delivery Time :
5-15 days
Contact Supplier
Steel Concrete Tunnel Formwork Reusable Easily Assembled
Steel Concrete Tunnel Formwork Reusable Easily Assembled
Steel Concrete Tunnel Formwork Reusable Easily Assembled
Steel Concrete Tunnel Formwork Reusable Easily Assembled
Steel Concrete Tunnel Formwork Reusable Easily Assembled

Sichuan Shunyao Supply Chain Management Co., Ltd.

Verified Supplier
1 Years
chengdu
Since 2018
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
1000000-1500000
Employee Number :
70~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement