Specifications
Payment Terms :
L/C, D/A, D/P, T/T
Surfacefinish :
Smooth or textured as per design
Functional :
Pretension
Brand Name :
FASEC
Girdertype :
I-Girder / Box Girder / T-Girder
Packaging Details :
Sea Freight (Container/Bulk Vessel)
Material :
Precast Concrete
Model Number :
Precast Girder Bridge
Manufacturingmethod :
Factory precast and cured
MOQ :
100 MT
Delivery Time :
30-60 Days
Loadcapacity :
As per design specifications (e.g., HL-93, AASHTO standards)
Size :
Customized
Price :
USD 1,000-1,500/MT
Durability :
High resistance to corrosion and weathering
Width :
Variable, based on bridge design
Supply Ability :
5,000-15,000 MT/Year
Color :
Gold
Height :
Variable, based on girder type and span
Certification :
AISC IBR/ABR, AWS CWI, CE (EN 1090-1 FPC)
Designstandards :
AASHTO, Eurocode, or relevant local standards
Productname :
Precast Girder Bridge
Place of Origin :
China
Scope Of Application :
embedded part for building
Description

Highway and infrastructure projects demand steel girder bridges that arrive on site ready to assemble — with the right camber, the right splice fit, and the right documentation.

Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects


Phase 1: Project Definition & Design Compliance

Challenge: Highway authorities specify AASHTO LRFD for design, but the fabricator must translate design intent into shop drawings that work on the factory floor.

Our Approach:

  • Review your bridge design and confirm AASHTO LRFD load and resistance requirements

  • Prepare shop drawings with camber, sweep, splice and connection details

  • Flag any fabrication or transport constraints before production begins

Deliverable: Approved shop drawings, fabrication plan and standard compliance review.


Phase 2: Material Sourcing & Certification

Challenge: Highway projects require full material traceability — every plate must be certified.

Our Approach:

  • Source ASTM A709 bridge steel with Mill Test Reports

  • Grade 50 / 50W / HPS 70W selected to your design specification

  • 50W weathering steel available for exposed highway structures

Deliverable: Mill certificates for all steel plate, traceable to heat number and project mark.


Phase 3: Factory Fabrication & Welding

Challenge: Highway bridge girders must be welded to AWS D1.5 — the structural welding code for bridges.

Our Approach:

  • Cutting, forming and fit-up to AASHTO LRFD fabrication tolerances

  • Welding per D1.5 qualified WPS/PQR, performed by certified welders

  • AWS CWI inspection on all welding; NDT methods as specified

Deliverable: Welded plate girders, box girders or segmental spans, ready for dimensional verification.


Phase 4: Quality Verification & Trial Assembly

Challenge: If girders don't fit on site, the fix is slow, costly and weather-dependent.

Our Approach:

  • Verify camber, sweep, length and section depth against shop drawings

  • Trial-assemble splice connections and cross frames in the factory

  • Mark every component for its erection sequence

Deliverable: Trial assembly records, dimensional inspection reports and marked components.


Phase 5: Export Packing & Logistics

Challenge: Highway girders are long, heavy and must arrive undamaged.

Our Approach:

  • Lifting points marked for crane or launcher handling

  • Shipping brackets to prevent movement in transit

  • Segmental delivery where girders exceed road transport limits

Deliverable: Packing list with girder marks, lengths, weights and erection sequence; full documentation pack.


Phase 6: Site Assembly Support

Challenge: Site crews need clear instructions and reliable connections.

Our Approach:

  • Field-splice details for segmental girders

  • Installation manuals and online technical guidance

  • Documentation pack ready for the project file

Deliverable: Smooth site assembly with no field rework.

Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects


Standards & Certification

Standard / Certification Scope Application
AASHTO LRFD Bridge design specifications Design basis for all primary members
AWS D1.5 Bridge Welding Code WPS/PQR, welder qualification, inspection
ASTM A709 Bridge structural steel Grade 50 / 50W / HPS 70W as specified
AISC IBR / ABR Certified Bridge Fabricator Factory certification for major bridge work
AWS CWI Certified Welding Inspector Welding inspection coverage

What We Fabricate

Component Description Typical Configuration
Plate Girder (I-section) Primary highway bridge girders Welded I-section with stiffeners
Box Girder Longer spans, torsion loads, aesthetic sites Single-cell or multi-cell welded section
Spliced Segmental Girder Long spans where transport limits apply Segments shipped and field-spliced on site

Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects


Why Choose FASECbuilding?

At Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuilding), we bring over 20 years of experience in steel bridges and steel structures and exports to more than 100 countries and regions, specialising in steel bridges, factory buildings, trusses, composite floor decking and custom steel components. When you work with us, you get:

  • One factory for AASHTO LRFD design, ASTM material and AWS D1.5 welding

  • AISC IBR/ABR certified factory with AWS CWI inspection

  • Factory trial assembly — your girders fit before they ship

  • OEM/ODM — built to your drawings, not from a catalogue

  • Export packing and worldwide shipping with full logistics support


Send us your drawings, span and load requirements, and required standard today for a free quotation and technical proposal — Hangzhou FAMOUS Steel Engineering Co., Ltd. (FASECbuilding) is ready to fabricate your highway prefabricated steel girder bridge for road and infrastructure projects.

Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects

Send your message to this supplier
Send Now

Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects

Ask Latest Price
Payment Terms :
L/C, D/A, D/P, T/T
Surfacefinish :
Smooth or textured as per design
Functional :
Pretension
Brand Name :
FASEC
Girdertype :
I-Girder / Box Girder / T-Girder
Packaging Details :
Sea Freight (Container/Bulk Vessel)
Contact Supplier
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects
Highway Precast Girder Bridge Fabrication for Road and Infrastructure Projects

Hangzhou FAMOUS Steel Engineering Company

Verified Supplier
5 Years
zhejiang, hangzhou
Since 2002
Business Type :
Manufacturer, Importer, Exporter, Trading Company, Seller
Total Annual :
80000000-100000000
Employee Number :
1200~1500
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement