Modern Prefab Steel Structure Building Recyclable For Industrial Warehouses Office House
Project Description:
Steel Structure Warehouse Building Construction Large Span Easy Assemble. This is a heavy steel structre warehouse project that we are awarded as a General Contractor, that means our work scope include design, fabrication and construction. The construction floor area is about 36,720 square meters. As it is a heavy steel warehouse, the steel quantity for this project is about 3000Tons. We provide wleded steel beam&column, roof and wall panel, purlin, window and doors and other accessory.All components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
Product Advantage:
1. Wide span: Single span or Multi-span
2. Low cost: unit price range from USD50/m2 to USD80/m2 according to clients' request
3. Long lifespan: about 20~ 50 years
4. Fast construction and easy installation
5. Others: environmental protection, stable structure, earthquake resistance,
water proofing, and energy conservation.

Installation:
Method 1: We provide shop drawing before installation.
Method 2: If you still don't know how to install, We will teach you the installation in our factory. when necessary , we will assemble a sample steel structure building for you.

Packing & Loading:
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

| 1 | Location (where will be built?) | _____country, area |
| 2 | Size: length*width*height | _____mm*_____mm*_____mm |
| 3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
| 4 | snow load (max. snow height) | _____kn/m2, _____mm |
| 5 | anti-earthquake | _____level |
| 6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
| 7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
| 8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
| 9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
| 10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |