Specifications
Application :
Apartment, Hotel, Dormitory, Multi-floor Office
Brand Name :
Ruly Steel
MOQ :
200 square meters
Steel Material :
Q235B, Q355B or buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS
Assemblytime :
Shorter than traditional buildings
Service Life :
More than 50 years
Place of Origin :
Qingdao,China
Insulation :
Can be equipped with thermal and sound insulation
Application Fields :
Steel structure fabrication construction
Price :
USD19-USD39 Per Square Meter
Supply Ability :
20,000 square meters or 1,500 tons per month
Installation :
Engineer guidance on site
Prodution Color :
Customizable
Model Number :
RULYC010
Size :
Flexible
Hs Code :
9406900090
Surface Treatment :
Painting or Hot-dip Galvanized
Packaging Details :
40HQ/Open top container
Maintenance :
Low maintenance requirements
Certification :
CE,AISC,SGS, BV, ISO,GB
Working Scope :
Design,Fabrication, Installation
Payment Terms :
L/C,D/A,D/P,T/T,Western Union,MoneyGram
Delivery Time :
20 days
Description

The Prefabricated Steel Structure Hotel Building for Resort Accommodation is a modern hospitality solution designed for hotels, resorts, serviced apartments, and commercial accommodation projects. By combining high-strength steel framing with energy-efficient enclosure systems, the building achieves fast construction, flexible architectural design, and long-term durability.
Prefabricated Steel Structure Hotel Building for Resort Accommodation

Compared with traditional reinforced concrete buildings, steel structure hotels offer shorter construction periods, lower overall building weight, easier future expansion, and more efficient project management. All major structural components are prefabricated in the factory and assembled on site, ensuring high precision and consistent quality.

Prefabricated Steel Structure Hotel Building for Resort Accommodation

All main components are made in a factory and shipped ready for on site assembly. There is no need for on site welding — connections are bolted, which helps reduce construction time and labor costs. This also makes it easier to build in areas with limited skilled workers or tight project timelines.

Prefabricated Steel Structure Hotel Building for Resort Accommodation


Item name Specification Material Parameter Technical Treatment
Column Welded H-section, cross-section, Box, steel pipe Q235B,Q355B Paint or Hot-dip galvanized
Beam Welded H-section, steel Truss Q235B,Q355B Paint or Hot-dip galvanized
Bracing Tie rod, Casing pipe, Angle steel Q235B,Q355B
Purling C / Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q355B Hot-dip galvanized
Wall & roof panel EPS / PU / PIR / Glass wool / Rock wool Sandwich panel or coated steel sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding door, rolling door, glass door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot-dip galvanized
Window Alloy-Glass,Aluminium alloy-shutter, Louvers T=1.0~2.0mm Alloy
Skylighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot-dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot-dip galvanized,304
Bolt Ordinary, high strength 10.9S,4.8s Hot-dip galvanized
Anchor bolt Steel rod M24,M27, M30 Q235B

Surface Treatment Options

Surface Treatment

Suitable Environment

Alkyd Paint

General inland projects

Epoxy Paint

Most hotel and commercial projects

Hot-Dip Galvanizing

Coastal and highly corrosive areas

Applications

Application

Description

Resort Hotel

Vacation and tourism accommodation projects

Business Hotel

Urban commercial hospitality buildings

Boutique Hotel

Modern architectural hotel projects

Serviced Apartment

Long-term accommodation facilities

Staff Accommodation

Industrial or mining camp housing

Tourist Lodge

Eco-resort and scenic-area accommodation

Quality Inspection

Inspection Item

Purpose

Material Certificate

Verify steel grade

Welding Inspection

Ensure weld quality

Dimension Check

Ensure fabrication accuracy

Coating Thickness

Verify corrosion protection

Packing Inspection

Ensure shipping safety

Packaging & Shipping

All steel components are bundled and secured on steel pallets for safe handling and transportation. The pallets are loaded into containers using gantry cranes and forklifts, ensuring efficient and damage-free loading. Additional securing measures are applied inside the container to prevent shifting, deformation, or impact during sea transportation.Prefabricated Steel Structure Hotel Building for Resort Accommodation

FAQ

1. What types of hotels can be built with steel structures?

Business hotels, resort hotels, boutique hotels, serviced apartments, and multi-storey accommodation buildings.


2. How many floors can the steel hotel have?

Typically 2–10 floors or more, depending on local regulations and engineering design.


3. Can the room layout be customized?

Yes. Our structure design can be adjusted according to the layout you provided.


4. Is the building suitable for seismic areas?

Yes. Steel structures provide excellent seismic performance when properly designed.


5. What steel grades are available?

Commonly Q235B and Q355B structural steel.


6. What wall systems can be used?

Sandwich panels, AAC panels, concrete walls, curtain walls, and decorative cladding systems.


7. Can the hotel meet thermal insulation requirements?

Yes. Various insulation solutions are available based on local climate conditions.


8. What is the expected service life?

More than 50 years with proper maintenance.


9. Do you provide structural calculations?

Yes. Structural analysis and calculation reports can be provided.


10. Can you design according to local codes?

Yes. We can design according to project-specific wind, snow, and seismic requirements.


11. What surface treatment is recommended?

Epoxy paint for most hotel projects; hot-dip galvanizing for coastal environments.


12. How are the components packaged?

Steel members are bundled, labeled, and secured for container transportation.


13. Do you provide installation support?

Yes. Installation drawings, remote guidance, and engineer dispatch services are available.


14. What information is needed for a quotation?

Building size, number of floors, project location, room quantity, and design requirements.


15. How long does production take?

Usually 25–40 days depending on project scale.

Send your message to this supplier
Send Now

Prefabricated Steel Structure Hotel Building for Resort Accommodation

Ask Latest Price
Watch Video
Application :
Apartment, Hotel, Dormitory, Multi-floor Office
Brand Name :
Ruly Steel
MOQ :
200 square meters
Steel Material :
Q235B, Q355B or buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS
Assemblytime :
Shorter than traditional buildings
Service Life :
More than 50 years
Contact Supplier
video
Prefabricated Steel Structure Hotel Building for Resort Accommodation
Prefabricated Steel Structure Hotel Building for Resort Accommodation
Prefabricated Steel Structure Hotel Building for Resort Accommodation
Prefabricated Steel Structure Hotel Building for Resort Accommodation

Qingdao Ruly Steel Engineering Co.,Ltd

Verified Supplier
8 Years
shandong, qingdao
Since 2009
Business Type :
Manufacturer, Exporter
Total Annual :
15 Million-20 Million
Employee Number :
100~110
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement