Thin EPC design And Supply Solution For Solar Power Plant 5MW Solar Mounting System
Our quality control:
1. SGS720H salt test report
2. TUV and ISO certified
3. Mass production capbility
4. Rich experience in mega project management
5. Good relation with famous industry suppliers
Our advantages:
-Light steel structure profile production lines
-Finished steel profile
Test method
- Test method: GB/T10125-2012-Sample placement: 15°~25° with vertical direction
- Settlement salt solution concentration: (50+/-5) g/l NaCl
- Temperature inside the test chamber: (35+/-2) ºC
- Settlement rate of salt spray: 1~2ml (80cm2.h)
- Settlement salt solution pH value (25ºC+/-2ºC): 6.5~7.2-Exposure time: 720 hours (check once every 96 hours)
- Cleaning method: natural dry for 0.5~1.0 hours, then rinse with water of temperature not higher than 40ºC, then dry immediately.
Datasheet of EPC design And Supply Solution For Solar Power Plant 5MW Solar Mounting System
| Technical Information |
| Tilt Angle | 5~60 degree |
| Max Wind Speed | 23.8 m/s |
| Max Snow Load | 0.55 KN/m2 |
| Material | Galvanized Steel S550GD+Z350 |
| Warranty | 10 Years |
Why choose us for your solar system PV mounting brackets?
- Super anti-rusting performance
- High precision of structure material
- Save raw material, and cost 20%
- 20GW Yearly production capacipty, ensures short lead production time
- Perfect finish of structure material, hence the nice solar mounting effect
