In high-end cemented carbide manufacturing, the furnace is the heart of your production line. But is a slow cooling cycle acting as a bottleneck for your business?
At Ruideer, we believe efficiency should never come at the cost of quality. That is why our RDE Series Rapid Cooling Sintering Furnaces are engineered to redefine industry standards for speed and precision.
Why the RDE Series is a Game-Changer for Your Factory:
- Slash Cycle Times: The RDE-3312-1R delivers an incredible cooling rate, dropping from 1450℃ to 1000℃ in ≤35 minutes. This allows for more batches per day and significantly higher equipment utilization.
- Precision Material Integrity: Speed is nothing without control. Our furnaces maintain superior temperature uniformity, ensuring magnetic saturation deviation ≤± 0.2% and coercive force deviation ≤±0.3KA/M. Your products stay consistent, batch after batch.
- Ultra-Clean Sintering Environment: With an ultimate cold vacuum of 1Pa and a leak rate of just 3Pa/h, we provide the high-purity atmosphere required for top-tier alloys.
- Patented Efficiency: Our advanced debinding system captures ≥98% of forming agents (Paraffin, PEG, Rubber) under Argon negative pressure, drastically reducing maintenance downtime and protecting your vacuum pumps.
- Invest for the Future: Designed for a 20-year service life or 6,000 cycles, the RDE series is a long-term asset that grows with your business.
Proven Performance Across Borders