Automatic High-Accuracy Chocolate Corrugated Foil Wrapping Machine with 200-300ppm Packing Speed and PLC Control for Decorated Chocolates
The SL-SBZB450W series packing machine features a special corrugated aluminum foil pattern with clear grain definition and novel styling, designed specifically for decorated and gilded diamond shape chocolates.
System Configuration
The complete system consists of one SL-SBZB450W Packing Machine and one SL-SBZL500 Auto Feeding Machine.
Technical Specifications
Performance Parameters
| Parameter |
Value |
| Packing Speed |
200ppm |
| Chocolate Size (Diameter) |
L:10-80mm W:4-45mm H:4-35mm |
| Total Power |
5 kW |
| Power Supply |
380V 50HZ 3P |
| Air Supply |
0.6 MPa |
Wrapper Specifications
| Material |
Tinfoil, Aluminium Foil |
| Requirements |
Wrapper must be sent to factory 30 days with order |
Air System Requirements
| Air Pressure |
0.6 MPa |
| Air Displacement |
0.6 m³/min |
Sample Requirements
| Chocolate Sample/Mould |
Must be sent to factory 30 days with order |
Main Components
SBJS260 Packing Machine
- Servo motor for feeding paper - Panasonic (Japan)
- Touch screen - Weinview (Taiwan)/Omron (Japan)
- Precision Potentiometer - Omron (Japan)
- Rotary Encoder - Omron (Japan)
- Material sensor - Leuze (Germany)
- Paper Feeder Sensor - Leuze (Germany)
- Color Mark Sensor - Leuze (Germany)
Electric Cabinet
- PLC - Chengdu (SL)
- Frequency Converter - Delta (Taiwan)
- Circuit Breaker - Schneider (France)
- Solid Relay - Omron (Japan)
- Switch Power Supply - Omron (Japan)
SL-SBZL500 Auto Feeding Machine
- Contact Area - PU
- Frame - Stainless Steel
- Motor - GPG
- Motor Control - Delta (Taiwan)
Package and Shipping Details
| Component |
Gross Weight |
Dimensions (L×W×H) |
| Packing Machine |
1800 kg |
2970×1520×2200 mm |
| Feeding Conveyor |
680 kg |
2370×970×1250 mm |
| Total: 2480 kg, 14 m³ |
Installation and Service Terms
Facility installation and debugging will be completed at BUYER's factory by an assigned engineer from SELLER's factory. BUYER is responsible for all expenses incurred once the engineer departs from China, including transportation, meals, accommodations, and additional costs during installation and debugging.
