OEM Custom Stainless Steel Precision Sheet Metal Fabrication Parts Stamping
Sheet Metal Fabrication:
- Design: The process begins with the design of the sheet metal part using CAD (Computer-Aided Design) software. The designer creates a 2D or 3D model of the part.
- Material Selection: Choose the appropriate sheet metal material based on factors like strength, corrosion resistance, and cost.
- Material Cutting: The selected sheet metal is cut to the required size and shape using various methods like shearing, laser cutting, or plasma cutting.
- Blanking: This involves cutting out the basic shape of the part from the sheet metal.
- Forming: Forming operations, such as bending, stamping, or deep drawing, are performed to shape the metal into the desired form.
- Assembly: If the part consists of multiple components, they are assembled together. This may involve welding, riveting, or fastening.
- Finishing: Surface treatments like painting, powder coating, or plating can be applied to improve aesthetics and protect against corrosion.
- Quality Control: The finished part is inspected to ensure it meets the required specifications and quality standards.
| Brand |
Chenyang |
| Our products |
High-speed rail/ bullet train/ subway spare parts, Fitness/ massage equipment spare parts, Wind power accessories, Automobile / motorcycle spare parts, Solar street light spare parts, Telecommunication and security equipment spare parts, Water filter accessores, Plastic air filter spare parts, Fire Accessories etc, such as Sheet plate series, Cabinet Series,Die casting series, CNC machining series,Injection plastic series etc |
| Place of Origin |
|
| Size |
OEM Standard Size |
| Surface |
Matte or gloss or according to clent's requirement |
| Process |
die casting Cnc maching |
| Available Materials |
AL:5052/5754/5082/5083/6061/6063/6082….
ZL101/ZL102/ADC12…
Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D…
Stainless steel: 304/316/430/201... |
| Payment |
T/T, L/C, Money Gram, Western Union |
| Delivery |
Sample: 3~5 days for no mould items and 7~10 days for mould items
Mass goods: 15~20 working days |