Green Hydrogen Electrolysis Feed Water Veolia E-Cell MK-9 Suez EDI Stacks 8.0 M3/H High Flow EDI Module
Electrolyzer stacks are unforgiving about feed water: dissolved cations and anions poison the membranes, while organic carbon degrades catalyst performance. Green hydrogen projects therefore specify ultrapure water with resistivity above 16 MOhm-cm and very low TOC before the water enters the electrolysis loop. The Veolia E-Cell MK-9 Suez EDI stack delivers that quality at a nominal 8.0 m3/h, making it a natural building block for megawatt-scale PEM and alkaline electrolysis plants.
The MK-9 is the highest capacity member of the E-Cell family in this range, engineered for continuous industrial duty with recovery of up to 97%. Because electrodeionization replaces mixed-bed polishing, hydrogen plants avoid the logistics of acid and caustic deliveries on remote sites and cut the wastewater that a chemical regeneration process would produce.
Key Features| Parameter | Specification |
|---|---|
| Nominal Flow | 8.0 m3/h (35 gpm) |
| Typical Designed Production | 6.0-10.0 m3/h |
| Product Resistivity | >= 16 MOhm-cm |
| Total Organic Carbon (TOC as C) | <= 0.5 ppm |
| Recovery | Up to 97% |
| Voltage | 0-400 VDC |
| Amperage | 0-5.2 ADC |
| Inlet Pressure | <= 6.9 bar (100 psi) |
| Pressure Drop | 2.4-3.4 bar (35-50 psi) |
| Feed Water TEA | < 13 ppm as CaCO3 |
| Feed Water Conductivity | < 22 uS/cm |
| Feed Water Hardness | < 1.0 ppm as CaCO3 |
| Feed Water Silica | < 1.0 ppm as SiO2 |
| Temperature | 4.4-40 deg C (40-104 deg F) |
| pH | 4 to 11 |
| Dimensions (W x H x D) | 30 cm x 61 cm x 74 cm |
Green hydrogen projects install MK-9 stacks in the ultrapure water block between reverse osmosis and the electrolyzer feed tank. The combination of high resistivity and low TOC protects PEM electrolyzer membranes, while the 6.0 to 10.0 m3/h operating window suits containerized hydrogen plants and larger central utility blocks.
The same stack serves power-to-X demonstration units, hydrogen refueling station water systems and ammonia or methanol synthesis pilots where guaranteed water purity is a condition for long membrane life. Multiple stacks are paralleled to reach the 50 to 200 m3/h water blocks typical of commercial electrolysis facilities.
Packaging & Quality AssuranceMK-9 stacks ship in export-grade wooden crates with internal shock protection, accompanied by the factory performance certificate, dimensional drawings and installation manual. Standard stock delivery takes 5-8 working days, with project-based scheduling available for large multi-stack orders.
Our team supports hydrogen developers with system sizing, Winflows projection checks and startup assistance. Share your electrolyzer capacity, site water analysis and target feed quality, and we will propose the complete EDI polishing configuration with a firm quotation.