Spray-and-Go Instant Release
No blow-drying process, direct injection after spraying, shorten the production cycle by 15%. Flexible production line for fast mold change

Equipped with high-speed dispersing machine imported from Germany and nanoscale filtration equipment to ensure uniform particle size and stable performance. The annual production capacity can meet the annual demand of large shoe factories

In order to meet the market requirements, the company has a formal chemical park production Basic land certificate, iso9001 quality management system certification, environmental protection certificate Impact assessment certificate, fire safety acceptance certificate and other factory safety production certificates A certificate of qualification. In addition, the depth of more than 60 products, the final development of products involving high-end electronics, construction, clothing waterproof, silicone, high-end film coatings
