Tunnel Type Paper Pulp Molding Drying Machine / Drying Production Line
Specifications:
|
Heating Material |
Length |
Width of the Tunnel |
Capacity |
|
Oil / Gas |
20~50 m |
2~4 m |
2~10 ton/24hours |
|
Coal / Wood |
20~50 m |
2~4 m |
2~10 ton/24hours |
|
Biomass Fuel |
20~50 m |
2~4 m |
2~10 ton/24hours |
|
Steam |
20~60 m |
2~4 m |
2~12 ton/24hours |
|
Conduction Oil |
20~60 m |
2~4 m |
2~12 ton/24hours |
|
Electricity |
20~50 m |
2~4 m |
2~10 ton/24hours |
Descriptions:
Production Information and Our Warranty:
Applications:
| Egg tray | 20,30,40packed egg tray… quail egg tray |
| Egg carton | 6, 10,12,15,18,24 packed egg carton… |
| Cup salver | 2, 4 cup salver |
|
Artware |
Mask, Christmas balls, Easter Eggs , boutiques… |
|
Disposable Medical Care Products |
Bedpan, sick pad, female urinal… |
|
packages |
Shoe tree, industrial package… |
Competitive Advantages:
Business Terms
|
NO. |
ITEM |
DESCRIPTION |
|
1 |
Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
|
2 |
Delivery Terms |
FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
|
3 |
Delivery Time |
45-75 days |
|
4 |
Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
|
5 |
Installation |
Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
|
6 |
Warranty |
12 months after installation |
|
7 |
After service |
|
|
8 |
Quotation Validity |
90 days after the offering date |
