Specifications
Place of Origin :
China
MOQ :
Negotiable
Price :
Negotiable
Payment Terms :
T/T
Supply Ability :
100000pc/Month
Delivery Time :
4 Weeks
Packaging Details :
PCB+ Box
Brand Name :
CUSTOM MADE
Certification :
ISO/UL
Product Type :
PCB Board Assembly
PCB Board Name :
Rigid-flex boards,Metal base boards
SMT Lines :
12 SMT lines
Min BGA Footprint :
03015 Chip/0.35mm BGA
Materials :
RCC,Nelco
Min Mechanical Hole :
0.1mm
HDI :
1+n+1、2+n+2、3+n+3
Parts SMT Accuracy :
±0.04m
Payment Method :
T/T
Whether to Support customization :
Support
Logistics :
Accept customer specified logistics
Description

Immersion Gold + OSP PCB Assembly POP Boards M4 M6 12 SMT Lines

PCB Board Assembly Description:

In the product solution, we support flexible supply, and one-stop service for SMT, post-soldering, assembly, and testing, and support rigid board, flexible board, and rigid-flex board at the same time, we have the smallest components (such as 01005), is a cooperative supplier that precisely matches the best strategy.

PCB Board Assembly Parameter:

SMT Capability 14 million spots per day
SMT Lines 12 SMT lines
Reject Rate R&C: 0.3%
IC: 0%
PCB Board POP boards/Normal Boards/FPC boards/Rigid-flex boards/Metal base boards
Parts Dimension Min BGA Footprint:03015 Chip/0.35mm BGA
Parts SMT Accuracy:±0.04mm
IC SMT Accuracy:±0.03mm
PCB Dimension Size:50*50mm-686*508mm
Thickness: 0.3-6.5mm

PCB Board Assembly Introduction:

We specialize in high-speed turn-key PCB services: PCB design, Fabrication, Components sourcing, PCBA, and Supply Chain service. The superior service we offer our customers high quality, technically advanced products within the customer’s timescales.
We serve our customers, the customer always comes first. Customer-centric, hard-working, innovative, honest, happy, and transparent; customer-centric, professional, efficient, and win-win.

FAQ:

Q: What are the benefits of choosing us?

1. Save time

Tongzhan is fully aware of the market pressure of customers. We work according to the client's time. Because we're able to handle everything under one roof in one streamlined process, you get the benefits of working with one company and one timeline.

2. Turnkey Solutions

Co-exhibition provides turnkey services including PCB layout, PCB fabrication, and assembly. This can help you save administrative time.

Q. How is the delivery?

1. Usually, our delivery time is about four weeks, but it depends on the actual situation when we receive your order.

2. If your order is urgent, please contact us directly, we will prioritize and do our best to give you a satisfactory delivery time.

Immersion Gold OSP PCB Board Assembly POP Boards M4 M6 Bga Pcb Assembly

Send your message to this supplier
Send Now

Immersion Gold OSP PCB Board Assembly POP Boards M4 M6 Bga Pcb Assembly

Ask Latest Price
Watch Video
Place of Origin :
China
MOQ :
Negotiable
Price :
Negotiable
Payment Terms :
T/T
Supply Ability :
100000pc/Month
Delivery Time :
4 Weeks
Contact Supplier
video
Immersion Gold OSP PCB Board Assembly POP Boards M4 M6 Bga Pcb Assembly

TONGZHAN INDUSTRIAL LIMITED

Active Member
4 Years
shenzhen
Since 2011
Business Type :
Manufacturer
Total Annual :
5000000-10000000
Employee Number :
50~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement