Specifications
Thickness Of Panel :
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Design Load :
Wind, Snow, Seismic
Maintenance Costs :
Reduced
Using Life :
50 Years
Material Grade :
Q355B, Q235B
Sand blasting :
Sa 2.5
Warranty :
5 Years
Product :
Steel Structure
Brand Name :
TISIN
Model Number :
TISIN
Certification :
ISO, CE, SGS
Place of Origin :
Shandong, China
Place Of Origin :
Qingdao, Shandong, China
MOQ :
1000 sqm
Price :
USD 40-60 / sqm
Payment Terms :
T/T,L/C
Supply Ability :
100,000 sqm / month
Delivery Time :
6 weeks after shop drawing get approval
Packaging Details :
Packed on steel pallet with fixture and loaded into 40'HQ/OT
Connection :
Bolts
Insulation :
EPS, Glasswool, Rockwool, PU On Option
Design software :
PKPM, Tekla structures, CAD
Description
Storage Solutions Steel Structure Building Hurricane Proof Metal Warehouse
Product Attributes
AttributeValue
Warranty5 Years
Maintenance CostsReduced
ConnectionBolts
InsulationEPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life50 Years
ProductSteel Structure
Material GradeQ355B, Q235B
Design LoadWind, Snow, Seismic
Design softwarePKPM, Tekla structures, CAD
Sand blastingSa 2.5
Modern Prefabricated Steel Building

The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it ideal for industrial warehouses, offices, or residential use. This structure utilizes steel to create a robust load-bearing framework, known as the main frame, which consists of beams and columns.

Structural Components

The building features a comprehensive bracing system, including:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These elements work together with precision-engineered roof, wall, and floor systems to form a complete metal structure.

Advantages Over Traditional Concrete Buildings
  • Enhanced Strength: Unlike traditional concrete buildings, metal workshop structures use steel plates or sectional steel, resulting in significantly higher strength and improved seismic resistance.
  • Faster Construction: Most components are prefabricated in factories, allowing for quick on-site assembly and greatly reducing the overall construction period.
  • Sustainability: The reusability of steel minimizes construction waste, making these buildings more environmentally friendly.

This modern prefabricated steel building offers a versatile and efficient solution for a variety of applications, combining strength, speed, and sustainability.

Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Product Specifications
ProductsSteel Structure Warehouse
Frame typePortal frame, multi-story frame
Main frameHot-rolled or Welded H beam and column, Q355B steel
Bracing componentsTie bar, staying bar, Horizontal bracing, Column bracing
Cladding systemSandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
AccessoryRidge tile, trim, Gutter, Down pipe, skylight, clerestory
DoorRoll up door, industrial section door, swing door, Sliding door
WindowPVC window, aluminum window, metal louver
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Our Advantages
Advantages of Steel Structure Building

1. Easy to assemble
Prefabricated steel components are installed on-site as per drawings: first steel columns with cross-bracing, followed by roof beams and horizontal bracing, and finally purlins and enclosures.

2. Cost-effectiveness
Its lightweight nature reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.

3. Simplified construction with short timelines
Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure building can be installed in approximately 40 days.

4. Energy-efficient & eco-friendly
Corrugated color steel sheets and sandwich panels boast energy-saving properties. Dry construction avoids dust and pollution from concrete work, and steel's recyclability further reduces environmental impact.

Design Key Factors

1. Optimal column spacing
Using H-section steel columns and beams, column spacing directly influences steel usage and costs. Typically set at 6.8-9m for economic efficiency (adjustable for specific needs). Building height should align with functional requirements (e.g., equipment, human activity) and maintenance access.

2. Proper lighting & ventilation
Large-span, open interiors demand human-centric, energy-saving designs. For tall buildings, ground-floor operable windows serve as primary air inlets, paired with roof ventilators to efficiently address lighting and ventilation needs.

Differences vs. Concrete Buildings

1. Shorter construction period
Prefabricated components require minimal on-site welding, making steel structure construction significantly faster than concrete builds.

2. More eco-friendly
Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.

3. Better cost performance
Faster construction cuts labor costs, with total expenses roughly 20-30% lower than traditional concrete buildings. Steel also offers greater durability.

4. Lighter structure
Lightweight metal walls and roofs—far lighter than brick-concrete alternatives—reduce overall weight, easing foundation loads.

Strict Quality Inspection
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
FAQ
1. What materials are used in your steel structure buildings?

Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.

2. What certifications do your steel structure buildings have?

Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.

3. How long is the construction period of a steel structure building?

The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.

4. Can steel structure buildings be customized according to needs?

Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.

5. Do you provide installation guidance for steel structure buildings?

We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.

Send your message to this supplier
Send Now

Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse

Ask Latest Price
Watch Video
Thickness Of Panel :
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Design Load :
Wind, Snow, Seismic
Maintenance Costs :
Reduced
Using Life :
50 Years
Material Grade :
Q355B, Q235B
Sand blasting :
Sa 2.5
Contact Supplier
video
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse
Storage Solutions Custom Steel Building Hurricane Proof Metal Warehouse

QINGDAO TISIN STEEL STRUCTURE CO.,LTD

Verified Supplier
2 Years
shandong, qingdao
Since 2020
Business Type :
Manufacturer
Total Annual :
500-1000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement