Wholesale Prefab Steel Structure Workshop Industrial Design Style
Product Attributes
| Attribute |
Value |
| Type |
Portal Frame Structure |
| Drawing design |
SketchUP/AutoCAD/PKPM/3D3S/TEKLA |
| Main frame |
Welded H-shape Steel Beam |
| Material |
Q235B/Q355B Steel |
| Welding method |
SAW, MIG, GMAW |
| Surface treatment |
Sand blasting Sa2.5 + Anti corrosive paint |
| Life Time |
Main Structure 35-50 Years |
| Delivery Time |
30-45 Days |
Product Description
The Customized Steel Structure Workshop Building with a prefabricated delivery solution utilizes steel to create a robust load-bearing structure. This main frame consists of beams and columns, supported by a comprehensive bracing system that includes tie bars, knee bracing, stay bars, column bracing, and horizontal bracing. Together with the roof, wall, and floor systems, these components form a complete metal structure.
Advantages Over Traditional Concrete Buildings
Metal workshop buildings employ steel plates or sectional steel instead of reinforced concrete, resulting in:
- Higher Strength: Enhanced load-bearing capacity and structural integrity.
- Improved Seismic Resistance: Better performance in seismic conditions.
- Reduced Construction Time: Most components are prefabricated in factories, allowing for quick on-site assembly.
- Environmental Sustainability: The reusability of steel significantly reduces construction waste, making these structures more eco-friendly.
Specification
| Dimension |
Length x Width x Eave height/ Ridge height |
| Frame type |
Portal frame, multi-story frame |
| Main frame |
Hot-rolled or Welded H beam and column, Q355B steel |
| Bracing components |
Tie bar, staying bar, Horizontal bracing, Column bracing |
| Cladding system |
Corrugated color steel sheet, sandwich panel with glass wool, rock wool, PU insulation |
| Accessory |
Ridge tile, trim, Gutter, Down pipe, skylight, clerestory |
| Door |
Sliding door, Roll up door, industrial section door, swing door |
| Window |
PVC window, aluminum window, metal louver |
Advantages of Steel Structure Workshop
- Easy to assemble: Prefabricated components arrive ready for quick on-site assembly following precise installation drawings.
- Reasonable cost: Lightweight design reduces foundation costs while fast construction enables quicker production startup.
- Simple construction, short construction period: Factory prefabrication allows a 4000m² building to be installed in approximately 40 days.
- Energy-saving and environmentally friendly: Uses dry construction methods and energy-efficient materials to minimize environmental impact.
Design Important Factors
1. Reasonable column spacing: Typically 6.8m to 9m for optimal steel usage and cost efficiency, adjustable for special requirements.
2. Proper lighting and ventilation design: Incorporates roof ventilators and strategically placed windows to address the challenges of large-span spaces.
Difference Between Metal Structure and Concrete Building
- Short construction period: Factory prefabrication enables rapid on-site assembly with minimal welding required.
- Environmental Friendly: Dry construction process eliminates water usage and reduces dust pollution.
- Favorable Cost: Typically 20-30% lower total cost than concrete buildings with superior durability.
- Structure Weight: Significantly lighter than traditional brick-concrete construction.
Why Choose TSIN
With nearly 20 years of experience, TSIN has successfully implemented hundreds of projects worldwide. Our professional engineering team provides complete solutions for:
- Pre-Engineered Steel Buildings
- Buildings For Heavy Industry
- Buildings for commodity industry
- Industrial Steel Structures
Project Gallery
We have exported to many countries including: Australia, PNG, Fiji, Samoa, Indonesia, Philippines, Malaysia, Maldives, Ghana, Mauritius, Benin, Rwanda, Ethiopia, Cameroon, Tanzania, Angola, Nigeria, Madagascar, Seychelles, Chile, Columbia, Paraguay, Venezuela, Costa Rica, Guyana.