Prefab Indoor Metal Free Span Light Steel Structure Frame Horse Riding Arena Hall Building
Durable and easy to maintain
The steel structure building is light in weight,designed by general computer can resist harsh weather and only needs simple maintenance.
Simple construction, short construction period
All components are prefabricated in the factory,and only simple assembly is required on site, thus greatly shortening the construction cycle, a building of 6000 square meters can be basically installed in 40 days.
Reasonable cost
Steel structure building is reducing the cost of foundation, fast in construction, and can be put into operation as soon as possible, and the comprehensive economic benefits are much better than concrete structure building.
|
Steel structure workshop composition
|
|
1.Primary Framing
|
H column and beam
|
|
2.Secondary Framing
|
Z andC sections purlin
|
|
3.Roof and Wallpanels
|
steel sheet and insulated sandwich panels
|
|
4.Steel Decking Floor
|
Decking board
|
|
5.Structural subsystem
|
Canopies,Fascias,Partitions,etc.
|
|
6.Mezzanines,Platforms
|
H beam
|
|
7.Other Building Accessories
|
Sliding Doors,RollUp Doors,Windows,Louversetc.
|
|
Name
|
Steel Structrue Building
|
|
Main Material
|
Q235-Q420 Welded H Beam And Hot Rolled Section Steel
|
|
Surface
|
Painting Or Galvanizing
|
|
Roof And Wall Panel
|
EPS Sandwich Board,Single Corrugated Steel Plate,Glass Cotton Colored Board for Customers'Choice
|
|
Window
|
PVC Or Aluminum Alloy
|
|
Door
|
Sliding Door Or Rolling Shutter Door
|
|
Service
|
Design
|
We have experienced designers to design.
|
|
Manufacture
|
We can manufacture allkinds of steel structure products according to customers'needs.
|
|
Installation
|
We provide detailed drawings to ensure installation. It also provides installation,supervision and training services. We can alsosend a team of engineers to guide or install on site.
|
|
Packing
|
1.Steel structure components will be in nude packaging with proper protection. 2.Sandwch panels will be covered with pasticfilm. 3.Bots and other accessories will beloaded into wooden boxes. 4.Container Drying Treatment. 5.According to customer's requirement
|
|
Quality Inspection
|
Factory Self-inspection Customer Inspection Third Party Inspection
|
Qualified Workers and Experienced Engineers
After more than 20 years of development, we now have 152 employees, making sure we are capable of handing bulk orders within a short period ,10 of whom are senior engineers with ample experience, so we can design according to your drawings, if you don’t have drawings, don’t worry, you just need to tell me your request and local climate, our engineer can do the most suitable design for you, it is free. All the workers have more than 10 years of experience and are qualif
Raw Materials.
Raw materials are a major factor in the cost of steel horse riding arena construction.
Steel and plates are the main components of steel buildings, accounting for approximately 70%-80% of the total construction cost.
Therefore, fluctuations in the market price of steel raw materials directly affect the cost of steel horse stable construction.
Complexity Of The Structure
Complexity Of The Structure
The complexity of the structure also affects the construction cost of steel buildings in China.
The more complex the structure, the higher the requirements for design solutions and technology, and therefore, the higher the
construction cost of industrial steel buildings
Height, Span and additional items
Height and span are also important factors in the cost of a steel building. In addition, if your prefabricated steel building is considering the installation of a bridge crane, the price will also vary.
In short, the exact cost depends on the use of your prefabricated steel building and the height-to-span ratio.



