Multi Cavity Injection Molded CNC Process Brass / M2 Thread Mold Cores With Chamfer
CNC Process Brass/M2 Material Threaded Core With Chamfer For Multi-Cavity Injection Molded Parts
Threaded core is manually placed inside the mould tool and once the part is moulded, the moulding with the core still inside is removed from the moulding machine. The operator then removes the core from the threaded core moulding, often with a power tool. There will most likely be 2 threaded cores, so that the machine can carry on moulding with one core while the operator removes the other thread core from the part.
Thread Mold Parts Specifications
| Material |
Brass/M2 |
| Hardness |
48-52HRC |
| Heat treatment |
Available |
| Service |
Made-to-order |
| Surface treatment |
/ |
| Closest tolerance |
± 0.01mm |
| Polishness |
Ra0.6 |
| Axiality |
0.01mm |
| Verticality |
0.01mm |
Our Service of Thread Mould Parts
- Customer's request is our purpose and target.
- Quick samples delivery service and produce according to your BOM.
- Professional production team, strictly quality control department, experienced sales department.
- One-stop solution for our long term customers.
- Customized size and OEM/ODM service acceptable.
- 100% inspect before deliver, quality warranty and long term after-service.
- Competitive price, Excellent service, Quick delivery, Safety payment, Flexible trade terms.
What We Can Do?
- Core pin, cavity pin, insert pin etc
- HSS punch, Precision punch, Special-shaped punch
- Ejector pins, ejector sleeve, two-stage ejector pins etc
- Guide pillars, Guide bushings, Guide post set
- Slide Core Units, Latch locks, locating Series
Quality Control of Thread Mould Parts
SENLAN has strict quality control system from the raw material incoming to finished products outgoing. Our mould parts are guaranteed high precision, high polished and long service life.
Quality Inspection Process
- Material incoming: 100% inspection
- Rough Finished: 100% inspection
- Heat treatment: random inspection
- Face grinding: 100% inspection
- Center-less cylindrical grinding: 100% inspection
- OD/ID grinding: 100% inspection
- EDM: 100% inspection
- Wire-Cutting: 100% inspection
- Packing: the final 100% inspection before the formal shipment
Packaging & Delivery
Package: Coated with anticorrosive oil, packed in carton box
Delivery: Delivery time is usually 7-15 working days for type of ejector pin, specific time is according to quantity.
Shipping: We ship using express such as DHL, UPS, FEDEX etc. or according to customer's requirement. It takes about 3-5 days to arrive your front door, and proof of shipments are provided with a shipping or tracking number. And we ship by ocean shipment for larger quantity items, it will be economic for customers.
Frequently Asked Questions
Q: What is your quote elements?
A: Product standard: model + size, or customer Drawing.
Q: How can you ensure the quality?
A: We have QC department to control the quality from the beginning of production until goods finish.
Q: If you make poor quality goods, will you refund our fund?
A: As a matter of fact, we won't take a chance to do poor quality products. Meanwhile, we manufacture goods quality products until your satisfaction.
Q: Do you test all your goods before delivery?
A: Yes, we have 100% QC test and QC report for mold parts before delivery.
Q: Can you produce according to the samples or drawings?
A: Yes, we can produce parts by your samples or technical drawings