Traditional techniques are limited, and conventional support methods are difficult to suppress the continuous deformation of surrounding rock. In the initial construction, the maximum deformation reached 2125 millimeters, and the arch replacement rate was as high as 33%;
Efficient mechanized construction, Keda intelligent multi strand anchor cable installation trolley adopts traction mechanism and cable feeding device, realizing continuous and suspended delivery of anchor cables, reducing ground friction resistance, and significantly improving installation efficiency; Through the collaborative operation of the main arm and auxiliary arm, combined with constant resistance anchor cable technology (such as NPR anchor cable), the deformation of the surrounding rock is effectively controlled to within 300 millimeters, and the arch replacement rate is reduced to zero.
1. Intelligent control
Equipped with intelligent sensing and automation control system, supporting precise positioning and parameter adjustment, achieving precise construction of anchor cable hole positions;
Integrated fault self checking function, reducing operational complexity and improving job stability;
3. Safety and Environmental Protection
Equipped with multi-level security protection mechanisms, including automatic emergency stop and remote monitoring systems, suitable for complex environments such as tunnels and mines;
Low noise, low emission design meets green construction standards.
Technical Parameter | Value |
---|---|
Drilling Diameter Of Rock Drill | Φ33~64mm |
Propulsion Speed During Anchor Cable Mixing | 3m/min |
Model | KMS810 |
Max. Drilling Depth Of Rock Drill | 10m |
Max. Depth of Anchor Cable | 10m |
Max. Operating Height | 8m |
Rock Drill Power | 18Kw |
Anchor Cable Mixing Rotation Speed | ≥350rpm |
In order to enhance the construction quality and efficiency of prestressed anchor cables in soft rock large deformation tunnels, as well as to facilitate the mechanization process of such tunnels, the Muzhailing Highway Tunnel serves as a foundation for the development of key technologies for mechanized construction of prestressed anchor cables. A breakthrough has been made in achieving integrated construction of prestressed anchor cable drilling, installation, anchoring, and pulling, paving the way for a fully mechanized construction approach for soft rock large deformation tunnels.
Following the experimental section research conducted along the Wudu Right Line, the main conclusions drawn are as follows:
Product Customization Services for Rock Drilling and Anchoring and Grouting Equipment
Customize your Drill Rig and Anchor Injection Equipment with the following attributes:
Brand Name: POTENTIAL / POTENCY
Model Number: KMS810
Place of Origin: CHINA
Certification: ISO9001:2015
Minimum Order Quantity: 1 Unit
Price: Negotiable
The Product Technical Support and Services for the Drilling Anchoring Grouting Equipment include:
- Installation assistance
- Training for operators and maintenance personnel
- Troubleshooting guidance
- Maintenance and repair services
- Equipment upgrades and enhancements
Shipping:
We offer fast and reliable shipping services for our Drilling Anchoring Grouting Equipment. Orders are processed promptly and sent out with reputable carriers to ensure timely delivery to your location. You will receive a tracking number to monitor the progress of your shipment.
Q: What is the brand name of this drilling anchoring grouting equipment?
A: The brand name is POTENTIAL / POTENCY.
Q: What is the model number of this drilling anchoring grouting equipment?
A: The model number is KMS810.
Q: Where is this drilling anchoring grouting equipment manufactured?
A: This equipment is manufactured in CHINA.