Explosion-proof Fire Resistance 35W Horn Speaker Red
Feature:
1.Explosion-proof PA, EVAC, paging and music horn speaker. 2.Special design for industrial application like oil field, gas field, coal mine and nuclear power station.Compact size consistent with spot lighting and architectural design. 3.Suitable for explosion-proof, indoor & outdoor and waterproof extremely hostile working environment. 4.Built-in 100v/70v line transformer. 5.IP66 waterproof and dustproof rate. 6.Power output 35W @100V. 7.Steel enclosure and stainless steel bracket in red 8.Compliant with explosion-proof EXDII CT6.
Model
|
FEX-335
|
Description
|
Fireproof Horn Speaker
|
Power Output
|
35W
|
Output
|
100V/70V
|
SPL
|
102dB(Rated power /1m)
|
Frequency Response
|
250-8KHz
|
Explosion-proof
|
EXDII CT6
|
IP Rate
|
IP66
|
Material
|
Stainless Steel body in red
|
Mounting
|
With U-shaped mounting bracket
|
Dimension
|
202(W)×135(D)×285(H)mm
|
Weight
|
5.5kg
|
Company Profile
Guangzhou FTD Audio Limited is a leading manufacturer of Public Address System and Conference System in China, We are focus on R&D and our Professional R&D team already 15 years′ experience on Audio field. FTD audio will offer the professional products and
service to each of partner and do a win win business with our partners!
Our main products are Public address system ,EVAC system, IP PA system ,conference system ,PA amplifier and PA speaker.These
system are all designed and produced by our engineer. We are accept OEM,ODM order.
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.
2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
3. What's your warranty period?
Our warranty period is 12 months for speaker.
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
5. Where is your main market?
Customers are mainly from Europe, Middle East and South Asia.
6. How many days do you need to prepare for the goods?
It takes 30 working days for large order.