12"350w Professional Audio Loudspeaker Active Speaker With Volume Control
Model
|
FAW-1235B
|
Amplifier type
|
Class D amplifier
|
Input sensitivity
|
- 4 dBV
|
Protection
|
multiple limiter, short circuit, thermal protection
|
Controls
|
On / Off switch, master volume, 30-150HZ analog crossover switch
|
Indicator light
|
power indicator, signal indicator, limit indicator, protection indicator; high and low frequency boost and attenuation knob
adjustment
|
Signal input/output interface:
|
input XLR / Router-output XLR;
|
Power input/output interface
|
Neutrik PowerCon;
|
Amplifier output power
|
600W/8 ohms
|
Mid-woofer
|
1×12" (156 magnetic Φ65mm)
|
Tweeter
|
1×1.34" (Φ34mm)
|
Frequency Response (±3dB)
|
70Hz-18kHz
|
Rated/peak power
|
350W/700W
|
Impedance
|
8 ohms
|
Sensitivity
|
98dB
|
Maximum sound pressure SPL
|
125dB
|
Coverage angle (H×V)
|
120°×60°
|
Product size (W*D*H)
|
350W×385D×602H
|
Company Profile
Guangzhou FTD Audio Limited is a leading manufacturer of Public Address System and Conference System in China, We are focus on R&D and our Professional R&D team already 15 years′ experience on Audio field. FTD audio will offer the professional products and
service to each of partner and do a win win business with our partners!
Our main products are Public address system ,EVAC system,
IP PA system ,conference system ,PA amplifier and PA speaker.These system are all designed and produced by our engineer. We are accept OEM,ODM order.
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.
2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
3. What's your warranty period?
Our warranty period is 12 months for speaker.
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
5. Where is your main market?
Customers are mainly from Europe, Middle East and South Asia.
6. How many days do you need to prepare for the goods?
It takes 30 working days for large order.
Our Services & Strength
Quality: Quality is our life.
Customer: Customer first, crate value for our customer.
Service: Offer professional service to help customers, include suggestions, solutions etc
Dream: Help partners do a successful business, then FTD will be successful.