Specifications
Delivery Time :
30 days
Supply Ability :
50 sets
Packaging Details :
Container or Bulk Cargo Ship or Flat Rack
Place of Origin :
China
Brand Name :
Staurk
Certification :
CE ISO
Processing Capacity :
20TPH-5000TPH
MOQ :
1
Price :
2000USD-80000USD
Payment Terms :
T/T
Description

PLANTA CIP PARA ORO


Professional Gold CIP (Carbon in Pulp) production line for oxidized/low-grade/clay gold ore. 95%–98% gold recovery, 20–5000 t/d customizable. ISO/CE certified, turnkey solution with 24/7 support.

GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT


Product Overview

Our Gold CIP Production Line is a complete turnkey gold extraction system, specially designed for oxidized gold ore, low-grade gold ore and clay-type gold ore. The whole process covers crushing, grinding, cyanide leaching, carbon adsorption, desorption electrolysis and gold ingot smelting.

Different from traditional processing technology, the CIP production line does not need solid-liquid separation, which saves 30%-50% investment cost and greatly reduces floor space. It is the most popular and cost-effective solution for small and medium to large gold mines.


Core Advantages

High Gold Recovery Rate: Stable recovery rate reaches 95%-98% for oxide gold ore.

Wide Ore Adaptability: Perfect for oxidized gold ore, muddy gold ore, low-grade gold ore.

Cost Saving: No need for thickener and filter press, lower power consumption and labor cost.

Eco-Friendly Design: Closed water circulation system, professional cyanide destruction treatment, zero pollution discharge.

Flexible Capacity: Customizable output from 20TPD to 5000TPD.


Why Choose Our Factory

1.Professional mining equipment manufacturer with independent production workshop & processing equipment.

2.Strict raw material inspection and finished machine test before shipment to guarantee stable quality.

3.Lots of successful operating mine projects in Peru, Bolivia and multiple African countries.

4.Flexible matching scheme, match equipment according to your actual ore condition and budget.

5.Short production cycle, arrange production rapidly after receiving deposit.


Certificate


GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT



Factory & Equipment

GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT

Send your message to this supplier
Send Now

GOLD CIP PROCESSING PLANT GOLD ORE PROCESSING EQUIPMENT

Ask Latest Price
Delivery Time :
30 days
Supply Ability :
50 sets
Packaging Details :
Container or Bulk Cargo Ship or Flat Rack
Place of Origin :
China
Brand Name :
Staurk
Certification :
CE ISO
Contact Supplier
GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT
GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT
GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT
GOLD CIP PROCESSING PLANT  GOLD ORE PROCESSING EQUIPMENT

Henan Staurk Machinery CO.,LTD

Verified Supplier
1 Years
henan, zhengzhou
Since 2008
Business Type :
Manufacturer, Exporter
Total Annual :
3000000USD-5000000
Employee Number :
160~160
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement