Specifications
Brand Name :
VIC-TECH
Model Number :
VSM25C-48S-0127-145-01
Certification :
RoHS, ISO9001
Place of Origin :
China
MOQ :
1Unit
Price :
$11~$31/Unit
Payment Terms :
Western Union, T/T, L/C, MoneyGram
Supply Ability :
100000 Units/year
Delivery Time :
15-30 work days
Packaging Details :
Standard export package in corrugated carton (Mass production).
Motor type :
Permanent Magnet Linear stepper motor
Motor diameter :
25 mm
Step angle :
7.5°
Phase current :
160 mA
Phase number :
2 phases (Bipolar)
Coil resistance :
70Ω/phase
Description

VSM25C-48S 25mm Diameter External Drive Long Leadscrew Permanent Magnet Linear Stepper Motor

This is a 25mm diameter linear stepper motor equipped with an extra-long 145mm leadscrew. The leadscrew length is adjustable.

Since the leadscrew lead determines the motor's linear speed and thrust, a longer lead results in a higher linear speed but lower linear thrust/force.

We offer two different step angles: 7.5°/step and 15°/step.

Higher rated voltage results in higher motor coil resistance, which depends on the customer's power supply and driver parameters.

Customers can select all parameters according to their needs.

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

Plus tt has extra low noise and high stability.

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Design Layout (Unit:mm)

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 25mm
Rated voltage 12V DC
Phase current 160mA
Phase resistance 70Ω/phase
Phase inductance 65 mH/phase
Step angle 7.5°
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 145 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Send your message to this supplier
Send Now

VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Ask Latest Price
Watch Video
Brand Name :
VIC-TECH
Model Number :
VSM25C-48S-0127-145-01
Certification :
RoHS, ISO9001
Place of Origin :
China
MOQ :
1Unit
Price :
$11~$31/Unit
Contact Supplier
video
VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter
VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter
VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter
VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter
VSM25C-48S External Drive Long Lead Screw Permanent Magnet Linear Stepper Motor 25mm Diameter

Changzhou Vic-Tech Motor Technology Co., Ltd.

Verified Supplier
8 Years
jiangsu, changzhou
Since 2011
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter, Trading Company
Total Annual :
5000000-6000000
Employee Number :
20~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement