1. The whole tire is directly put in,no need to pre-break and pull the steel ring. 2, From the entire tire to 1-7mm granules, the entire process of production packaging, no secondary handling intermediate links. 3, The maximum processing capacity is 5000kg/h,and only 7 people can complete the entire site operation. 4, According to the customer's output requirements configuration equipment,200kg/h-5000kg/h,a wide range of options. 5,Fully-combined two-tier structure makes installation, replacement, maintenance and maintenance more convenient and safer. 6,seamless connection, full dust, smoke monitoring performance. 7, Adhere to the 80-100 hours feeding test before the single factory to ensure stable. 8.CE certification, uniform standards,focus on technology.