Galvalume Steel Coil · 55% Al-Zn-Si Coating · DX51D+AZ / S250GD+AZ / S350GD+AZ / S550GD+AZ · 0.14–2.0 mm · AZ80–AZ150 · Slitting & Cut-to-Length Available
Chromated / non-chromated surface treatment is the anti-corrosion and paint-adhesion passivation applied to the Galvalume coating.
| Item | Specification |
|---|---|
| Product | Galvalume Steel Coil |
| Main grade | DX51D+AZ (general forming) / DX52D+AZ |
| Structural grades | S250GD+AZ / S280GD+AZ / S350GD+AZ / S550GD+AZ subject to specification |
| Coating | 55% Al – 43.5% Zn – 1.5% Si (AZ) |
| Coating mass | AZ80 – AZ150 g/m² typically supplied; other coating masses subject to mill capability, grade, thickness and order specification |
| Applicable standards | GB/T 2518-2019 · EN 10346 (corresponding +AZ grades) · ASTM A792/A792M and JIS G3321 under their respective designation and grade systems |
| Thickness | 0.14 – 2.0 mm, subject to grade / coating / width / mill capability |
| Width | 600 – 1250 mm |
| Spangle | Zero / minimized / regular |
| Surface treatment | Oiled / dry / chromated / non-chromated / anti-fingerprint, subject to specification |
| Coil ID | 508 / 610 mm |
| Coil weight | 3 – 8 MT or customized |
| Edge condition | Mill edge / slit edge |
| Processing | Slitting / cut-to-length |
| MOQ | 5 MT |
| Lead time | Typically 20 – 30 days |
| Packing | Seaworthy export packing |
| Payment | T/T / L/C |
Key Features
Applications
Seaworthy export packing to protect surfaces and edges during ocean transport. Typical lead time is 20–30 days after commercial confirmation. Shipment can be arranged from Shanghai, Tianjin, Qingdao or Weifang.
Kyzotech is the export brand of Nanjing Shunshuo New Material Technology Co., Ltd. — a manufacturer of steel structure building materials and enclosure systems, established in 2016.
Kyzotech is our export brand; our website and email are hosted at metalroofsystems.com.
Q1: Is this supplied as a standard stock item? Yes, this surface specification is confirmed on request; grade, dimension and processing are matched to your order.
Q2: Can you customize to my project requirements? Yes. Grade, dimension, coating and processing can be matched to your drawings and application requirements.
Q3: What documentation do you provide? Mill test certificates, packing list and shipment documents. Third-party inspection can be arranged on request.
Q4: What is your MOQ and lead time? MOQ and lead time are confirmed per grade and specification; typical lead time is 20–30 days.
When you enquire, specify your surface together with grade, dimension, quantity, coating requirement and destination port.