Aluminum Coil · 1060 / 3003 / 5052 · 0.2–6.0 mm · Slitting & Cut-to-Length Available
Custom-width aluminum supply slit to your exact width within the available range.
| Item | Specification |
|---|---|
| Alloy | 1060 / 3003 / 5052 |
| Other alloys | 3004 (Al-Mn-Mg) — available for specific architectural / Al-Mg-Mn roofing applications upon request, order-based |
| Temper | Available tempers vary by alloy and application, including: 1060 → H14 / H18 / H24 · 3003 → H14 / H24 · 5052 → H32 / H34; other tempers subject to alloy, thickness and mill capability |
| Item | Specification |
|---|---|
| Product | Aluminum Coil (mill finish) |
| Thickness | 0.2 – 6.0 mm, subject to alloy / width / mill capability |
| Width | 800 – 1500 mm |
| Coil weight | 1 – 3 MT or customized |
| Coil ID | 508 mm |
| Edge condition | Mill edge / slit edge |
| Processing | Slitting / cut-to-length |
| MOQ | 1 MT |
| Lead time | Typically 20 – 30 days |
| Packing | Seaworthy export packing |
| Payment | T/T / L/C |
| Item | Specification |
|---|---|
| Material standard (alloy designation & composition) | GB/T 3190 |
| Dimensional & delivery requirements | GB/T 3880; EN, ASTM or JIS equivalents available under their respective designation and grade systems on request |
Key Features
Applications (by alloy)
Seaworthy export packing to protect surfaces and edges during ocean transport. Typical lead time is 20–30 days after commercial confirmation. Shipment can be arranged from Shanghai, Tianjin, Qingdao or Weifang.
Kyzotech is the export brand of Nanjing Shunshuo New Material Technology Co., Ltd. — a manufacturer of steel structure building materials and enclosure systems, established in 2016.
Kyzotech is our export brand; our website and email are hosted at metalroofsystems.com.
Q1: Is this supplied as a standard stock item? Yes, this service / configuration specification is confirmed on request; grade, dimension and processing are matched to your order.
Q2: Can you customize to my project requirements? Yes. Grade, dimension, coating and processing can be matched to your drawings and application requirements.
Q3: What documentation do you provide? Mill test certificates, packing list and shipment documents. Third-party inspection can be arranged on request.
Q4: What is your MOQ and lead time? MOQ and lead time are confirmed per grade and specification; typical lead time is 20–30 days.
When you enquire, specify your service / configuration together with grade, dimension, quantity, coating requirement and destination port.