| Product Name | Metal CNC Machining Parts |
|---|---|
| Material Available | Steel |
| Processing | CNC |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Engineer Support | Available for engineering assistance and drawings design |
| Packaging | Bubble and Carton or Customization |
|---|---|
| Port | Shenzhen |


Provide drawings (PDF/DWG), 3D models (STEP/IGES/SLDPRT), specifications
Engineering assessment, DFM analysis, process planning (24-48 hour response)
Detailed pricing with breakdown (material, setup, machining, finishing)
Sample production with full inspection report
Process validation, inspection plan agreement
Scheduled production with milestone updates (weekly/daily)
Complete FAIR or dimensional report before shipping
Appropriate packaging, shipping with tracking, customs documentation
| Production Type | Standard Lead Time | Expedited Options | Factors Affecting Lead Time |
|---|---|---|---|
| Prototype (1-10 pcs) | 5-15 business days | 3-5 days (+30-50%) | Material availability, complexity, fixturing |
| Low Volume (10-100 pcs) | 10-25 business days | 5-10 days (+25-40%) | Tooling requirements, secondary operations |
| Medium Volume (100-1,000 pcs) | 3-5 weeks | 2-3 weeks (+20-35%) | Production scheduling, capacity |
| High Volume (1,000+ pcs) | 6-12 weeks | 4-8 weeks (+15-30%) | Material procurement, dedicated production runs |
| Large Parts (>1m dimension) | 4-10 weeks | 3-6 weeks (+25-50%) | Special handling, machine availability |