Fixing Poly Film Grey Lock Channel And Spring Wire For Using Greenhouse Accessories
Overview
Essential details
- Manufacturer:
-
Made by ChengDu XLZY
- Instruction for use:
-
Please refer to manual
- Size:
-
Large
- Type:
-
Greenhouse Accessories, Greenhouse Accessories
- Cover Material:
-
Galvanized
- Model Number:
-
KF-3BS
- Place of Origin:
-
Sichuan, China
- Brand Name:
-
JP
- Product name:
-
Greenhouse Low Cost Galvanized Lock Channel And Wiggle Wire
- Application:
-
Greenhouse
- Material:
-
Galvanized
- Features:
-
High Strength
- Keyword:
-
Wiggle Wire
- Advantage:
-
Super Strong Resistance
- MOQ:
-
1 Meters
- Length:
-
Custonmized
Japanese Standard, Japanese Production Line, Eight Procedures of Inspection; Anti-fake stripes,Thicker ends of wire, Economical
and Safe. FEATURES
1.Less transfer of heat to the plastic.
2.Alloy section for high strength with light weight 130 gsm / rmts ( Approximately)
3.Working with 2-3 zig zag wires.
4.Designed with smooth edges to avoid any damage to plastics.
5.Good performance on corrosion resistance
7.Optional : 0.8mm 1.0mm 1.2mm 1.4mm in thickness
8.Can be used in recycle, lower growing cost.
9.Makes greenhouse film, shade cloth and curtain installation fast and easy.
1.Economical 2.Safety
3.Quality Guarantee
4.Pressure bearing
Q:How can I Get The Price ?
A: Within 24 hours after we get your inquiry. If you are urgent to get the price, please call me or tell me in the email.
Q: How long is your delivery time?
A: According to your greenhouse size and system,Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q:Are you trading company or manufacturer ?
A: We are factory.
Q: How to install the greenhouse? Do you provide installation service ?
A:We will provide paper or video building manual, or if needed we will send engineer to do installation guidance.
Q: What preparations I should be before installation ?
A:First: finish the greenhouse building authorization from the government if required.
Second :prepare the tools as per the tool list we send to you.
Third :prepare the workers.
Forth: prepare the po wer supply if needed.
Fifth: prepare one place that can store the greenhouse materials after arrival to protect it from rain.