Broad and Even Light Distribution with 90 deg LED Light Lens for Flood and Tunnel Lighting Durable Construction
This describes an LED lighting component designed for wide-area illumination, featuring a specialized lens, dimming capabilities, and robust construction. It's suitable for applications like flood lighting and tunnel lighting.
Quick detail
| Product Name: | CM-S25074-A90D-80H1 | Beam Angle: | 90° |
| Efficiency: | 92% | Material: | PC |
| LED Chips | 3030/2835 | Dimmable: | L250*W74 mm |
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
| Application: | Flood Light,Tunnel Light, Street Light | ||
Description
Broad and Even Light Distribution with 90 deg LED Light Lens for Flood and Tunnel Lighting Durable Construction
Specifications
| Product Name: | CM-S25074-A90D-80H1 |
| Beam Angle: | 90° |
| Efficiency: | 92% |
| Material: | PC |
| LED Chips | 3030/2835 |
| Size: | L250*W74 mm |
| Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
| Application: | Flood Light,Tunnel Light, Street Light |
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
| Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: | EXW , FOB , CNF , CIF |
| Payment Terms: | T/T , PayPal , Western Union, Moneygram |
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES

Drawing

Notices:
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.