Texture Wall Paint 5kg Kashilin velvet The light-dark texture and multi-level light and shadow effects make
Product Features
1. Efficient decomposition of formaldehyde (formaldehyde purification performance ≥ 90%)
2. Release of negative oxygen ions (continuous release of 1000-2000/cm³)
3. Smoking deodorization
4. Moisture absorption and moisture resistance
5. Antibacterial and mildew-proof (I-level antibacterial, 0-level mildew-proof)
6. Stain-resistant and rub-resistant (I-level stain-resistant, washable times ≥ 6000)
7. Odor-free and environmentally friendly
8. Artistic texture: Yin-yang surface texture and multi-level light and shadow effects, the texture is like velvet, and the touch is as soft as silk.
Product Use
Suitable for special effect decoration of indoor walls of various buildings such as high-end residences, villas, hotels, clubs, venues, office buildings, public areas, etc.
Technical Parameters
Product model | LNYA010 |
Product type | Texture paints velvet |
Main material | Diatomaceous earth, acrylic resin, nano titanium dioxide, graphene |
Appearance | Silvery White viscous liquid |
State | No lumps, uniform after stirring |
Solid content | 48%±2% |
Density | 1.4g/ml±0.05% |
Color | Silvery White |
Gloss | ≤60° |
Contrast ratio | ≥0.95 |
Alkali resistance (24 h) | No abnormality in coating |
Stability(-5C) | No degradation |
Scrubbing resistance | ≥6000 times |
Constructability | No obstacles in applying two coats |
VOC | Below the detection limit |
Formaldehyde content | Below the detection limit |
Total content of benzene series | Below the detection limit |
Total lead (Pb) content | Below the detection limit |
Soluble heavy metal content | Below the detection limit |
Pigment | Lead-free pigment |
Solvent type | Water-based |
Theoretical coverage | 4-5㎡/1KG/2 times |
Dilution ratio | Can be diluted with no more than 15% of clean water |
Drying time | Surface drying time ≤2h |
Maintenance time | 7 days/25℃, extended at low temperatue (not less than 5℃) |
Implementation standard | GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings" |
Product specification | 5KG/barrel |
Shelf life | 24 months |
Storage | Store in a sealed, cool and dry place at 5℃~35℃, prevent frost and avoid sunlight. |
Construction methods | Roller painting;Hand-rubbing application |
Formaldehyde purify ratio | ≥90% |
Antibacterial rate | Antibacterial rate of Escherichia coli and Staphylococcus aureus ≥99.9% |
Stain resistance | Level 1 |
Mold resistance | Level 0 |
Negative Air Ion (NAI) Generation Capacity | Release negative oxygen ions (continuous release of 2000/s.cm³) |
Usage method
Construction method: rolling, rubbing, etc.
Construction tools: material tray, palette knife, masking paper, short-hair roller, brush, special sander, etc.
Construction process: ①On the putty layer, roll on one coat of penetrating sealing primer and wait until it is completely dry;
②Roll on the first coat of Imosha S primer and wait until it is completely dry;
The primer needs to be the same color (same color as the topcoat), and the materials need to be mixed evenly. When constructing, it is advisable to apply the slurry evenly on the wall from the upper part to the lower part, from left to right, from inside to outside, from easy to difficult, and use a roller or spray gun to apply the slurry evenly on the wall. The force should be uniform and no coating should be missed; after the primer is completed, the wall needs to be patched, and the primer must be applied after the patch is polished and smoothed; after the primer is rolled on a large area, the corners of the wall must be painted in place, and the coating surface must be allowed to dry and dry to the touch, and the topcoat can be applied only after it is not sticky when pressed by fingers.
③Roll the second coat of Imosha S primer and wait until it is completely dry;
④Roll the first coat of Kashilin, and then rub it with a special grinder to form a specific process pattern according to the specific process requirements, and wait until it is completely dry;
⑤Roll the second coat of Kashilin, and rub it with a special grinder when it is 60% dry to form a specific process pattern.
Construction environment: It is not suitable for construction when the temperature is lower than 5℃ or the relative humidity is above 80%.
Base treatment: Before construction, clean the surface of the base to be painted to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new base surfaces such as gray sand, plaster, cement, etc. (pH value is lower than 10, moisture content is lower than 10%) should be dried before construction.
During construction, please configure necessary protective and labor protection supplies according to local operating specifications, such as protective glasses, gloves and professional construction clothes.
Before construction, stir thoroughly and use in a certain proportion. The mixing container must be clean and free of other chemical substances.
Please use clean water to clean the equipment in time during and after construction.