Bicycle parts introduction 
| Specification | |
| Frame | Hi-ten steel frame with water decal painting for OL lady |
| Fork | Hi-ten steel with painting |
| Handlebar | CP steel handlebar |
| Stem | Aluminium goose stem |
| Brake | Front and rear caliper brake or V- brake |
| Tire | Wanda King 26/28*1.75 black tires with A/V inner tube |
| Shifting speed | Shimano 6 speeds |
| Hub | Kenli hubs |
| B.B sets | Sealed bottom |
| Chain | TEC |
| Chainwheel | Prowheel full alloy set with crank |
| Seat tube | CP steel 29.2mm |
| Pedal | PVC |
| Rear carrier | With steel CP carrier |
| Stand | CP steel side stand |
| Basket | You can choose whether to add the PVC basket |
|







| Delivery time | 30-40 days after receiving the payment of 30% deposit. |
| Payment | -Irrevocable L/C at sight. |
| Load port | Tianjin port,Qingdao port ,Ningbo port or customer's request |
| Warranty | -Frame Warranty against manufacturer defects, life time -Components Warranty against manufacturing |
| Packing | -One set per standard export carton. -85% SKD, 50% SKD and 100% CKD. -According to customer's request. |
| Feedback | We sincerely invite you to leave positive feedback to us if you are interested in our products. |
| After Sale | 1.If the package is broken because of the Express, you can complain with them. |
FAQ
1. Q: Where is your company located? How can I visit there?
A: Our factory is located in Tianjin City next to Beijing, China. Welcome to visit us.
2. Q: Can I get sample and how long will it take?
A: Yes. We can supply sample. And you need to pay for the sample and freight. About 7-15days after receiving the payment, we will send it out.
3. Q: What's the MOQ?
A: Our MOQ is 20FT Container
4. Q: Can I have my own customized product?
A: Yes. Your customized requirements for color, logo, design, package, carton mark, your language manual etc. are very welcome.
5. Q: Can I mix different models in one container?
A: Yes. Different models can be mixed in one container.
6. Q: What's the delivery time?
A: It will take about 35-45 days to finish an order, this period maybe need extra 10-15days because of government pollution control. But the exact time is according to actual situation.
7. Q: What is the payment terms?
A: T/T, L/C at sight
8. Q: How does your factory carry out quality control?
A: We attach great importance to quality control.Every part of our products has its own QC.
9. Q: What certificate do you have?
A: We have CCC, CE (EN71, EN14765), SGS, ISO9001 etc. Also we can apply any certificate if you need if the qty is OK.