Specifications
Brand Name :
jinwang
Model Number :
Second Floor Carton Transferring (Without Power)
Certification :
CE,CO,ISO
Place of Origin :
made in China
MOQ :
1 set
Price :
negotiation
Payment Terms :
L/C, T/T
Supply Ability :
1 set per month
Delivery Time :
15-90 work days
Packaging Details :
wooden cases
Machine Name :
Second Floor Carton Transferring (Without Power)
Material :
Aluminum Profile Frame Structure
Transferring :
Site Confirmation as per customer packing
Description

Second Floor Carton Transferring (Without Power)

1. Introduction

It is used to transport the carton from the second floor to the first floor after automatic carton opening. The equipment has simple structure, no power rail transportation, no consumable parts and low maintenance cost.

2. Technical Parameters

1 Material Aluminum Profile Frame structure
2 Transferring Site Confirmation as per customer packing






Send your message to this supplier
Send Now

Second Floor Carton Transferring Without Power

Ask Latest Price
Brand Name :
jinwang
Model Number :
Second Floor Carton Transferring (Without Power)
Certification :
CE,CO,ISO
Place of Origin :
made in China
MOQ :
1 set
Price :
negotiation
Contact Supplier
Second Floor Carton Transferring Without Power

Jiangsu Jinwang Intelligent Sci-Tech Co., Ltd

Verified Supplier
5 Years
jiangsu, changzhou
Since 2005
Business Type :
Manufacturer
Total Annual :
<75000000
Employee Number :
<600
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement