ITEM | 34P×30AWG+AB | ||||
CONDUCTOR | Material | Tinned copper stranded | |||
Size | 7/0.100mm | ||||
O.D.(Ref) | 0.30mm | ||||
INSULATION | Material | PP | |||
Min.average thickness | 0.12mm | ||||
Min.thickness at any point | 0.10mm | ||||
O.D. | 0.60±0.08mm | ||||
TWISTED | O.D.(Ref) | 1.20mm | |||
CABLING | Filler | Optional | |||
Material | Al-mylar(foil face out) | ||||
BRAID | Material | Tinned copper | |||
Size | 0.100mm(85% min.) | ||||
Jacket | Material | PVC | |||
Min.average thickness | 0.38mm | ||||
Min.thickness at any point | 0.31mm | ||||
O.D. | 9.80±0.30mm |
ELECTRICAL CHARACTERISTICS | |
Rated voltage:30V | |
Rated temperature:80℃ | |
Max. DC conductor resistance(20℃):381Ω/km | |
Dielectric Strength AC:0.5kV/1min |
PHYSICAL PROPERTIES | |||
PVC | |||
Tensile strength: | ≥10.3MPa | ||
Elongation: | ≥100% | ||
Aged condition: | 113±1℃×168h | ||
Percent of original tensile strength: | ≥70% | ||
Percent of original elongation: | ≥65% |
UL758-E258652-20060111A-CertificateofCompliance(2)...
Product character:
Flame rated : VW-1
Tensile strength:≥10.3MPa Elongation:≥100%
Aged condition:113℃×168H
Percent of original tensile strength: ≥70%
Percent of original elongation: ≥65%
Founded in 2004 with 9 million USD capital investment, our HQ factory in Kunshan covers 14980 square meters. In 2020 we established our Nantong facility with 100 million RMB capital investment which covers 34000 square meters.
With ISO9001, ISO14001, IATF16949, ISO13485 system certificates, all of our products have passed CCC, UL, CUL, CE, CSA, ETL safety certificates. We are working with global customers in various fields through our well-established sales system based on the management principal HONESTY, INNOVATION and ENVIRONMENTAL PROTECTION.
A: We produce consumer electronics wires, hook up wires, industrial cables, robot cables, EV charging cables, new/green energy cables.
A: We have UL, CE, 3C, Dekra, CQC, TUV, Rohs, Reach, ETL certificates.
A: Yes, we are willing to arrange samples for you.
A: Normally we can finish orders in 2-3 weeks, and 5-6 weeks in peak season.
A: We always provide a pre-production sample before mass production and conduct final inspection before shipment.