Certification Body:
Technischer Überwachungs-Verein
Certificate No. | Product Types |
R 50471285 | EVC H05BZ5-F EVC H07BZ5-F |
R 50488767 | 62893 IEC 126 |
structure diagram:
Reference standard:EN50620:2017
IEC 62893-4-1:2020
Product Category:
EVC H05BZ5-F(1.5-2.5,3Cores)+(0.5-1.0,0-12Cores);EVC H07BZ5-F3*1.5+(0.5-1.0,0-12Cores);
EVC H07BZ5-F(2.5-35,3-5Cores)+(0.5-1.0,0-12Cores);
62893 IEC 126 2*(4-150)+1*(4-95)+2*(2.5-6)+(0.5-1.0, 0-12Cores);
Construction:
Rated temperature EN50620:-35 ~ +90°C
Rated temperature IEC 62893:-25 ~ +90°C
EN50620 voltage:AC300/500V,450/750V
IEC 62893 voltage:DC1500V
conductor:Stranded bare or tinned copper
Insulation material:EV1-2
Sheath material:EVM-1
The material is soft, resistant to low temperature, oil, thermal shock, external load pressure and thermal stress, flame retardant up to VW-1, minimum bending radius up to 5*OD, easy to install. Comply with RoHS and REACH environmental protection requirements.
Product is applicable for all kinds of electric vehicles, charging piles, power station, charging station.
Structural parameter table:
Category | Wire specifications | Reference current (A) | Diameter (mm) |
62893 IEC 126 | 2×25+1×16+2×4+2P(2×0.75)+ P(7×0.75) | 100 | 28.4 |
2×35+1×16+2×4+2P(2×0.75)+ P(7×0.75) | 125 | 30.8 | |
2×50+1×25+2×4+2P(2×0.75)+ P(7×0.75) | 150 | 32.4 | |
2×70+1×35+2×4+2P(2×0.75)+ P(7×0.75) | 200 | 35.7 | |
2×95+1×50+2×4+2P(2×0.75)+ P(7×0.75) | 300 | 39.1 |
1. The detailed dimensions are subject to the product specifications.
2. Other specifications can be designed and manufactured according to customer requirements.
3. The color of the sheath is generally black or orange. If there is special requirement, it can be customized according to customer's requirement.