Specifications
Place of Origin :
China
Brand Name :
Linde
Certification :
ISO9001, CE, SGS
MOQ :
Negotiable
Price :
Negotiable
Packaging Details :
Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time :
1-7working days(depand on raw materials stocking)
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :
>300sets/month
Product Name :
Sludge drying equipment
Feature :
Easy Operation
Application :
stacking machine
Specification model :
Professional customization
Warranty :
1 Year
Weight :
OEM
Description

5.14 Sludge Drying Equipment Stacking Machine Plate Frame Machine Centrifuge Screw Press Belt Filter Press

Supply (cooperation) method and delivery cycle

STEP1: Determine the usage scenario.

SETP2: Analyze the quality of contaminated water (if necessary, perform laboratory analysis)

STEP3: Determine the treatment process.

4. The supplier forecasts the price duration and governance objectives of the equipment or system.

5 The supply and demand sides negotiate and negotiate the price schedule and the governance objectives, sign the contract and pay the supplier prepayment.

6. After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7. The supplier rushed to the place where the buyer needed to use the installation guidance and commissioning.

8. System training for equipment use and maintenance.

1) Equipment name: stacking machine

2) Use occasions: Suitable for sludge treatment in municipal sewage, food, beverage, chemical, leather, paper, printing and dyeing, pharmaceutical, winery and other industries

3) Equipment picture:

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Equipment diagram:​

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Process flow chart:​

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Installation site picture:

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Advantages:

high degree of equipment automation, saving labor; easy to block during operation, low operation and maintenance cost; continuous automatic operation, automatic operation from sludge lifting, dosing, dehydration, transportation; can be unattended, suitable for high risk Explosion-proof working environment; equipment is very compact, small footprint, low infrastructure requirements, saving infrastructure and supporting investment; low equipment failure rate, long service life; large processing capacity, multiple units can be used side by side; ultra low energy consumption, processing costs Low, comprehensive treatment costs are much lower than other sludge dewatering equipment.

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

Send your message to this supplier
Send Now

OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Ask Latest Price
Place of Origin :
China
Brand Name :
Linde
Certification :
ISO9001, CE, SGS
MOQ :
Negotiable
Price :
Negotiable
Packaging Details :
Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Contact Supplier
OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine
OEM Wastewater Treatment Plant , Sludge Drying Equipment Stacking Machine

Chongqing Linde Technology Development Co., Ltd.

Site Member
8 Years
chongqing, chongqing
Since 2012
Business Type :
Manufacturer
Total Annual :
1000000-1200000
Employee Number :
100~120
Certification Level :
Site Member
Contact Supplier
Submit Requirement