Specifications
Model Number :
HC-RF-V2
Evacuation Capability :
4 L/s
MOQ :
1 set
Delivery Time :
30 working days
Equipment Vacuum :
Less than 2 Pa
Payment Terms :
L/C,T/T,D/A
Brand Name :
HongCe
Packaging Details :
Plywood
Gas Source Pressure :
0.4 MPa minimum
Charging Accuracy :
Within 100 g: +/-0.5 g
Price :
Negotiation
Supply Ability :
20 set per 3 months
Charging Range :
10-500 g
Certification :
Calibration certificate(cost additional)
Control System :
PLC with MES interface
Residual Recovery Rate :
Up to 95%
Place of Origin :
China
Description
Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery
Refrigerant Filling Equipment with Pipeline Evacuation and Residual Recovery

Before a refrigeration circuit is charged, it must be emptied of air and moisture, and the pipeline connecting the machine to the product must be properly prepared. Manual processes for this are slow and typically result in residual refrigerant being released to atmosphere. The HongCe HC-RF-V2 combines pipeline evacuation and residual refrigerant recovery in a single automated sequence, preparing the circuit for charging without manual intervention and preventing unnecessary refrigerant loss.

Pipeline Evacuation as Part of the Cycle

Evacuation runs as a defined step within the charging sequence with monitored vacuum levels. The process automatically stops only when the required vacuum is achieved, eliminating operator judgment and ensuring consistent results.

Residual Refrigerant Recovery Before Charging

Instead of venting residual refrigerant from the line, the machine recovers it before releasing the charge. This recovery process maintains cleaner working areas, reduces refrigerant consumption, and helps facilities meet environmental reporting targets that customers increasingly demand.

Technical Specifications
Item Specification
Evacuation capability 4 L/s
Equipment vacuum Less than 2 Pa
Residual recovery rate Up to 95%
Charging range 10-500 g
Charging accuracy Within 100 g: +/-0.5 g
Control system PLC with MES interface
Typical Applications

Suitable for refrigeration and air-conditioning assembly lines, heat-pump production, and any process where circuits must be evacuated and prepared before precise refrigerant charging.

Engineering and Service Support

HongCe provides comprehensive support including installation, process tuning, and operator training. We can assist with recording evacuation and recovery data for internal and customer reporting. Preventive maintenance schedules and recommended spare parts are supplied with each machine.

Frequently Asked Questions
Can the recovery step be disabled for some products?

Yes. The sequence can be configured per recipe according to the specific product and refrigerant requirements.

Does recovery slow the cycle down?

Recovery is integrated into the charging sequence, making the total cycle time controlled and predictable.

Request a Configuration

Share your pipeline layout and target vacuum level, and we will propose an evacuation and recovery configuration tailored to your production line.

Send your message to this supplier
Send Now

Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery

Ask Latest Price
Model Number :
HC-RF-V2
Evacuation Capability :
4 L/s
MOQ :
1 set
Delivery Time :
30 working days
Equipment Vacuum :
Less than 2 Pa
Payment Terms :
L/C,T/T,D/A
Contact Supplier
Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery
Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery
Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery
Refrigerant Filling Equipment Performing Pipeline Evacuation for Residual Recovery

Guangzhou HongCe Equipment Co., Ltd.

Verified Supplier
13 Years
guangdong, guangzhou
Since 2003
Business Type :
Manufacturer
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement