Specifications
Brand Name :
Ally Hi-Tech
Place of Origin :
China
Price :
Negotiable
Delivery Time :
6 ~ 10 months
Packaging Details :
Seaworthy Package
application :
on-site hydrogen generation
Performance :
Reliability greater than 99.6%
Footprint :
Modularization
Automation :
Fully Automatic
Configuration :
Simple
Technology :
Pre-fabricated skid
Description

Pre Fabricated Skid Hydrogen Plant From Methanol No Environmental Pollution

General

To address small-scale to medium-scale on-site hydrogen generataion, Ally development the hydrogen generation process based on the methanol reforming associated with PSA purification system. After decasdes developmetn, Ally has been granted tens of patents and formulated the Chinese standard in this field.

Ally has gotten extensive experiences through the cooperation with top-ranked multi-national companies who are engaged in the on-site hydrogen supply, such as Air Liquide, Linde, Praxair etc..

Features

  • Pre-fabricated skid technolog reduces huge on-site installation workload.
  • It is a mature production technology, which can be operated safely and reliably.
  • The feedstock is easy to get by a small price fluctuation, and transported and stored easily too.
  • The process flow is short and simple,less land occupation and investment which can be recovered in a short period.
  • Automation is high and operation is simple and easy.
  • Both energy consumption and production cost are low.
  • No environmental pollution.

Process Schematic

Pre Fabricated Skid Hydrogen Plant From Methanol No Environmental Pollution

Process Description

The mixture of methanol and de-mineralized water, after pressurized, evaporated and superheated to a certain temperature, is fed into a reactor, where the reforming gases including H2, CO2, CO, etc. are formed under the action of the catalyst. The mixed gas is treated through the purification technology of PSA to get high purity hydrogen in one cycle.

Performance

  • Hydorgne Capacity: 200 ~ 600 Nm3/h
  • Hydrogen Purity: 99%~99.9995% (v/v)
  • Temperature : ambient
  • Product pressure: 0.8~2.5 MPa(G)
Send your message to this supplier
Send Now

Pre Fabricated Skid Hydrogen Plant From Methanol No Environmental Pollution

Ask Latest Price
Brand Name :
Ally Hi-Tech
Place of Origin :
China
Price :
Negotiable
Delivery Time :
6 ~ 10 months
Packaging Details :
Seaworthy Package
application :
on-site hydrogen generation
Contact Supplier
Pre Fabricated Skid Hydrogen Plant From Methanol No Environmental Pollution

Ally Hi-Tech Co., Ltd.

Verified Supplier
7 Years
sichuan, chengdu
Since 2000
Business Type :
Manufacturer
Total Annual :
27,000,000-30,000,000
Employee Number :
100~300
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement