Specifications
Brand Name :
T-WORKS
Model Number :
ZYC800B-B1
Certification :
ISO9001,GOAST,CE
Place of Origin :
Hunan, China
MOQ :
1 unit
Price :
Negotiable
Payment Terms :
L/C, D/A, T/T, Western Union
Delivery Time :
30days
Packaging Details :
Nude package for main body, plastic package for key parts
Delivery time :
30days after deposit received
After-sale service :
Engineer available any time
Color :
Customized
Quality gurantee :
1 year for structure
Crane :
25T
Lifting Pile's Length :
17m
Description

T-WORKS ZYC Series 800T Hydraulic Jack In Piling Machine For The Precast Concrete Pile With Noise Free And No Vibration

1. Product description :

Hydraulic Static Pile Drivers are featured with no noise, no vibration, no pollution and no rubbish left in construction site.It can work with H-piles, precast concrete and steel piles with different shapes,like round,square and tapered shape. There are series models range from 80T to 1200T

It is adopted the hydraulic system design of large power and high flow,the precast pile entirely depends on the hydraulic static pressure so that the pile can be pressed into the ground steadily and quietly.

The pressing-pile speed amounting to 300-800 meters within 8hours, which its quite more efficient than other conventional pile drivers.

This unique construction method with non-pollution has gradually taken place of the pile hammer.

2. Application:

1) Clay, soft soil, sand layer ,etc

2) Noise regulated area

3) Vibration regulated areas, such as near buildings, precision instrument buildings, subway, overpass and so on.

3. Specification of the ZYC800 hydraulic pile foundtion machine:

Item Model/size Item Model/size
Main pushing cylinder 250/180-1900 Pushing stroke 1.9m
Assistant pushing cylinder 280/220-1900 Pushing stroke 1.9m
Supporting leg cylinder 380/250-1100 Stroke for outrigger cylinder 1.1m
Long boat cylinder 200/125-3600 Stroke for long boat 3.6m
Short boat cylinder 200/125-700 Stroke for short boat 0.7m
Clamping cylinder 380/250-50 Clamping box 8cylinders type
Crane capacity 25Ton X 17 meters Pumps for pile pushing 3 * A7V107
Side jacking mechanism Standard type Engine motor for pile pushing 3* 37KW
Main working pressure 24Mpa Pumps for crane 1 * 107
Piling speed 7.2 m/min Engine motor for crane 1 * 37W
Max spun pile 800mm Max square pile 650mm
Min working size 14.7m x 8.52m Min weight for main body 55ton
Weight of main machine 190tons Counterweight needed 610tons
Total capacity 800Ton

4. Features advantages :

1) Patents support the technical and keep improving all the times

With keeping moving thought inside of all T-works' staffs, we always gather the detail requirements from our customers and know what they want according to the actual condition during working. The technical engineer will do improvment and make some new design to suit the actual needs, that is why we have accumulated many patents .

Highway Pile Foundation Drilling Machine No Vibration Energy Saving

2) Special side mechanism

Special side mechanism with separated pushing cylinder and clamping box , sharing the same clamps with center piling. The side distance to the wall is only 450mm, suitable for mini project in the narrow corner. It can reach half piling force of center. It can push the triangle pile, square pile, round pile, H- pile, and other shapes.

Highway Pile Foundation Drilling Machine No Vibration Energy Saving

3) Assembly and De- mobilization

After shipment, the machine has to be assembled using the instructions and maybe with help of our employees as usual , This takes one or two days, after which a trainning can be given in working with the hydraulic pile pusher.

This is a special design for its legs which is automatical . It can walk onto the trailer freely by its walking mechanism. Also no need to dismantle them during transporation .

Highway Pile Foundation Drilling Machine No Vibration Energy Saving

4) After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.
3)Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.
4)To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.
5)Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.

6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

Highway Pile Foundation Drilling Machine No Vibration Energy Saving

Send your message to this supplier
Send Now

Highway Pile Foundation Drilling Machine No Vibration Energy Saving

Ask Latest Price
Brand Name :
T-WORKS
Model Number :
ZYC800B-B1
Certification :
ISO9001,GOAST,CE
Place of Origin :
Hunan, China
MOQ :
1 unit
Price :
Negotiable
Contact Supplier
Highway Pile Foundation Drilling Machine No Vibration Energy Saving
Highway Pile Foundation Drilling Machine No Vibration Energy Saving

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Active Member
7 Years
hunan, changsha
Since 2005
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
20000000-30000000
Employee Number :
270~300
Certification Level :
Active Member
Contact Supplier
Submit Requirement