XCMG Hydraulic Pile Driver - High-Frequency Vibrating & 2700kg Hammer For Excavator
Product Overview
VIBRA Hydraulic Vibrating Pile Driver is a high-performance foundation equipment developed by Ye Kun Construction Machinery Co., Ltd.—a technology-oriented enterprise specializing in the production, sale, and service of vibration piling/extracting machinery, high-speed hydraulic pile drivers, and peripheral accessories. Widely used in global foundation engineering projects, this FV Series (FV-250 to FV-400) integrates innovative design and reliable performance to meet diverse construction needs.
The pile driver operates by transferring high-frequency vertical vibrations to the pile body, altering surrounding soil structure to reduce strength and induce liquefaction—minimizing friction for efficient driving via excavator downward force, hammer weight, and pile weight. For extraction, it uses excavator lifting power while maintaining vibration. With flexible adaptability to site soil conditions, moisture content, and pile type, it stands out as a versatile solution for modern foundation works.
Core Features
Key Advantages
Technical Parameters
| Item Model | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|---|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
| Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
| Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
| Applicable Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
Frequently Asked Questions (FAQ)
Q1: What is the warranty period for the VIBRA pile driver?
A1: The warranty period is 12 months from the date of completion of installation, covering the mainframe and key components (excluding wearing parts).
Q2: What is the minimum order quantity (MOQ)?
A2: The MOQ is 1 set, supporting flexible procurement for small-scale projects and large-batch orders alike.
Q3: What payment methods are accepted?
A3: We accept T/T (Telegraphic Transfer)
Q4: What is the delivery time?
A4: The production lead time is generally 7-35 days, with delivery to Shanghai Port. Overseas clients should account for additional shipping time.
Q5: Can I customize the machine with our company logo?
A5: Of course you can—logo customization is available to enhance your brand visibility.
Q6: How is product quality guaranteed?
A6: All equipment is strictly manufactured and inspected in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises," ensuring reliable performance.
Q7: Can I be your dealer?
A7: We warmly welcome you to become our dealer and look forward to developing long-term partnerships as regional general agents or strategic partners with ambitious individuals/companies.
Q8: How to place an order?
A8: The ordering process is simple and efficient:
About Ye Kun Construction Machinery Co., Ltd.
Ye Kun Construction Machinery Co., Ltd. is a professional technology-oriented enterprise dedicated to the R&D, production, sale, and service of vibration piling/extracting machinery, high-speed hydraulic pile drivers, and peripheral accessories. With a young, enthusiastic, and professional team, we adhere to the core values of "client as priority, quality as first concern, management as foundation." Our goal is to become the most professional and comprehensive hydraulic vibrating pile driver manufacturer and service supplier in the industry, providing reliable, efficient solutions for global foundation construction partners.
Core Keyword: Pile Driver
Product Series: VIBRA Hydraulic Vibrating Pile Driver (FV Series)
For inquiries, quotes, or partnership opportunities, please contact us today!