Core Keywords: Vibratory Pile Driver, Pile Extractor, Construction Pile Driver, Hydraulic Pile Driver, Sheet Pile Driver
Shanghai Yekun Construction Machinery Co., Ltd. is a specialized enterprise dedicated to the R&D, production, sales and after-sales service of vibratory pile driver and extractor. Our core products focus on high-efficiency pile drivers and their matching accessories, which are widely applied in various infrastructure construction projects.
After years of rapid development, we have gained extensive recognition from global clients and achieved double-digit growth in annual sales volume. Our brand VIBRA has established a strong market presence nationwide and expanded its footprint to international markets. To meet the growing market demand, Yekun Construction Machinery (Suzhou) Co., Ltd. was founded in May 2019 as a new manufacturing base, boasting an annual production capacity of 300 units.
Our vibratory pile driver series has won high popularity among clients for its outstanding structural design and user-friendly performance, with the following key features:
Compared with similar products in the market, our pile driver has unique competitive edges:
| Item Model | PCF-300 | PCF-330 | PCF-350 | PCF-450 | PCF-500 |
|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 3500 | 3300 | 3500 | 3300 | 3200 |
| Operation Pressure (Mpa) | 32 | 32 | 32 | 32 | 32 |
| Centrifugal Force (kn) | 385 | 420 | 470 | 535 | 585 |
| Max. Pile Length (m) | 12 | 12 | 15 | 18 | 21 |
| Arm Weight (kg) | 750 | 750 | 750 | 820 | 820 |
| Hammer Weight (kg) | 2750 | 2850 | 2950 | 3150 | 3350 |
| Matching Excavator (T) | 27~30 | 33~38 | 40~45 | 47~55 | 55~70 |
By matching with various professional clips, our vibratory pile driver can be used to drive and extract multiple types of piles, including:
It is widely used in a broad range of construction fields, such as:
A: The warranty period for the mainframe and key components is 12 months from the date of installation completion, excluding wearing parts.
A: We accept trial orders, and the MOQ is 1 set.
A: We support T/T.
A: The production lead time is generally 7-35 days, with delivery to Shanghai Port. Additional shipping time is required for overseas destinations.
A: Of course, we provide OEM/ODM services and can print your brand LOGO on the machine as required.
A: Our pile driver products are strictly manufactured in accordance with the national standard "Technical Conditions for Pile Driver Enterprises", ensuring stable quality and compliance with industry requirements.
A: We warmly welcome partners to join us as dealers. We look forward to cooperating with ambitious enterprises to develop into regional general agents and strategic partners.