We supply reliable, high-performance, environmentally friendly, technological, and modern galvanizing factories with complete one-stop service.
Our service scope includes:
| Aspect | Production Line Type | Advantages | Disadvantages |
|---|---|---|---|
| From layout | I type | Save space | Environmental protection effect is limited |
| L type | Environmental friendly | Requires large area | |
| Circle type | High efficiency | Applicable to limited product categories | |
| Small part type | High efficiency | / |
Compared to traditional AutoCAD drawings, our 3D view design presents a clearer and more understandable workshop layout. No confusing colorful lines - only designs that professionals and clients can easily comprehend.
After determining requirements, we provide comprehensive quotations including process introduction, equipment specifications, responsibilities, equipment lists, and preliminary drawings. Following on-site or online discussions, we finalize contract details and prepare:
After contract signing, we commence manufacturing by purchasing steel, raw materials, electronic components, and auxiliary equipment. We design custom software (machine control-PLC and HMI) for complete system automation.
Our engineers assemble and install equipment according to design specifications, welding steel structures, connecting power systems, and arranging overall layout management. We ensure equipment operates normally and adjust systems according to mechanical requirements and contract terms.
During commissioning, we conduct trial operations, adjust furnace combustion systems for optimal heat efficiency, optimize traveling crane operations for smooth process flow, and provide comprehensive technical guidance to ensure galvanized workpieces meet all technical requirements.
| Plan | What products will be galvanized? (steel structure, steel tower, lamppost, etc., and general size) |
| The annual design capacity ___________________ | |
| When is expected to start? ___________________ | |
| Galvanizing Plant | Workshop Size: L: ______ W: ______ H: ______ |
| Zinc Kettle | Zinc Kettle Size: L: ______ W: ______ H: ______ |
| Thickness of steel plate: ______ (50mm/60mm) | |
| Furnace Fuel | □LNG □LPG □Diesel Oil □Heavy Oil □Others: ________________ |
| Wastewater Treatment | □Yes □No |
| Acid Mist Treatment | □Yes □No (100% enclosed workshop pickling) |
| White Fume Treatment | □Yes □No |
| □Fully closed processing equipment (White fume is 100% collected) | |
| □Open processing equipment (White fume is 80% collected) | |
| Fluxing Tank Iron Removal | □Yes □No |
| Waste Heat Heating System | □Yes □No |
| Tank Anti-corrosion Protection | □PP □FRP □Granite |
| Auxiliary Equipment | ______________________________________ |
Tailor-made factory solutions - The worth of your trust
Choose Us For A Win-Win Future!