Encapsulated pretreatment Rooms Enclosed Pre-treatment Workshop for Hot Dip Galvanizing Plant Line Turnkey Project
Business Scope
- At present, we have the comprehensive capacity of the following: the design, manufacture, installation, commissioning and training of the hot dip galvanizing lines and the improvement of old galvanizing plants.
- We can also offer galvanizing technology support besides equipment.
Enclosed workshop for pre-treatment area
| Acid mist treatment | Enclosed pre-treatment workshop | to avoid the mist overflow |
| Acid mist absorption tower | to deal the mist |
Design Principles
- Advanced technology
- Easy for use and maintenance
- High quality
- Save energy and material consumption
- Rational layout
Acid Mist Enclosed Pretreatment Workshop
- Acid mist will occur during pickling
- Working Principle: the pretreatment workshop is closed, and the mist is collected and treated in it.
- In this way can efficiently avoid acid mist overflow, ensuring the efficient treatment.
Contact Us
If our products interest you, please contact us.
Meanwhile, please tell us the following information.
-
Materials to be galvanized
-
Biggest dimension or kettle size
-
Maximum weight
-
Maximum capacity per year
-
Power source
-
Fuel
