Circular Coil Outdoor Single Phase Pole Mounted Transformer 250KVA 333KVA 500KVA
Product Specifications
Attribute | Value |
Type | Power transformer, distribution transformer |
Material | Aluminum, Copper, Copper/Aluminum |
Frequency | 50Hz, 60Hz, 50Hz/60Hz |
Winding Material | Copper, Aluminum |
Application | Power |
Phase | Single Phase |
Coil Structure | Circular coil |
Coil Number | Multi-winding coil |
Input Voltage | 6kV, 10kV, 15kV, 35kV, 110kV, 3kV, 69kV |
Output Voltage | 400V, 208V, 200V, 415V, 110V, 220V, 380V, 440V |
Capacity/KVA | 25kVA, 37.5kVA, 75kVA |
Tapping Range | 2X2.5% |
Efficiency | >99.10% |
Capacity Range | 100kVA - 500kVA |
Customization | Available |
Advantages | Strong overload capacity, high reliability in continuous operation |
Product Overview
This high-efficiency single-phase pole transformer is designed for outdoor environments with excellent weather and corrosion resistance. Suitable for both residential and small commercial applications, it provides stable power supply while minimizing energy consumption.
HENTG POWER Single Phase Pole Mounted Transformer
Close-up view of transformer components
Technical Specifications
Capacity (KVA): 15, 25, 37.5, 50, 75, 100, 167, 250, 333, 500
Efficiency: Ranging from 98.82% to 99.49% depending on capacity
Dimensions: Various sizes available to accommodate different capacity requirements
Key Advantages
- Reduced Line Losses: Installed close to the load, these transformers shorten the low-voltage supply radius, reducing line losses by over 99%.
- Energy Efficient Design: Features high-efficiency wound core design for improved electrical performance and energy savings.
- Compact & Lightweight: Easy to install and transport, adaptable to various environments.
- Pole-Mounted Installation: Direct mounting on utility poles saves ground space, ideal for rural and suburban areas.
Transformer efficiency chart
Transformer installation diagram
Ordering Process
Step 1: We respond to inquiries within 1 hour, providing suitable transformer recommendations along with competitive quotations and payment terms. Our technical team will confirm all drawing details within 7 days after payment, including technical data, weight, and parts list.
Step 2: After finalizing production drawings, we prepare stock, manufacture, and conduct rigorous quality inspections before shipment. We provide QC reports and test reports for all products, ensuring quality assurance.
Transformer manufacturing process
Transformer testing facility
Transformer quality inspection
About HENTG POWER
Your global power system partner since 2011, serving over 100 countries with a 100,000 square meter smart manufacturing base.
Quality Assurance
- Strict process: Pre-production sample verification + final inspection report for each order
- Full series of transformers (oil-immersed/dry type/500KV level)
- One-stop delivery of GIS/switchgear/substation
- 100% compliant with 5 major international standards